Evaluasi Unjuk Kerja Alat Gali-Muat pada Kegiatan Penambangan Batubara di PT. Insani Bara Perkasa Site Kam 11 Loajanan Kalimantan Timur

Authors

  • Ruslan Patur Universitas Mulawarman
  • Harjuni Hasan Universitas Mulawarman
  • Henny Magdalena Universitas Mulawarman
  • Shalaho Dina Devi Universitas Mulawarman
  • Ardhan Ismail Universitas Mulawarman
  • Tommy Trides Universitas Mulawarman

DOI:

https://doi.org/10.61132/globe.v3i3.950

Keywords:

Heavy Equipment Evaluation, Performance, PC 400 Excavator, Mining Productivity, Mechanical Earthmoving

Abstract

This study aims to evaluate the performance of the loading and unloading equipment in coal mining activities at the Mahakam Pit, PT Insani Bara Perkasa Site Km 11, East Kalimantan. The research was motivated by the importance of achieving mechanical equipment performance standards according to the Decree of the Minister of Energy and Mineral Resources No. 1827 of 2018. Data were obtained through direct observation and analysis of actual working time and evaluation of operational constraint factors. The results of the analysis showed that before the evaluation, the mechanical availability (MA) value was 87.24%, physical availability (PA) 88.51%, availability utilization (UA) 88.73%, and effective utilization (EU) 78.54%. After evaluating the constraint time, there was an increase in all parameters: MA to 88.71%, PA to 89%, UA increased to 90%, and EU reached 80%. This evaluation also had an impact on increasing the productivity of the loading and unloading equipment from 268.41 bcm/hour to 284.43 bcm/hour. Thus, the evaluation of work obstacles is proven to be effective in increasing the efficiency and productivity of the digging-loading equipment at the research location.

References

Agustin. (2020). Analisis unjuk kerja alat berat pada tambang batubara PT. ABC dengan metode Overall Equipment Effectiveness (OEE).

Aziz, M. F., & Saputra, A. S. (2019). Evaluasi produktivitas alat berat pada tambang batubara PT. XYZ dengan pendekatan cycle time analysis.

Indonesianto, Y. (2016). Pemindahan tanah mekanis. Program Studi Teknik Pertambangan, UPN Veteran, Yogyakarta.

Kadir, E. (2008). Pemindahan tanah mekanis. Universitas Sriwijaya.

Peurifoy, R. L. (2006). Construction planning, equipment, and methods (7th ed.). McGraw-Hill Higher Education.

Prodjosumarto, P. (1996). Pemindahan tanah mekanis. Institut Teknologi Bandung.

Rochmanhadi. (2014). Productivity excavator and dump truck in open-pit mining operations. Andalas University Press.

Sumarya. (2012). Bahan ajar alat berat dan interaksi alat berat. Universitas Negeri Padang.

Tenriajeng, A. T. (2013). Seri diktat kuliah pemindahan tanah mekanis. Gunadarma.

Situmorang, J. R. (2015). Manajemen alat berat dalam proyek konstruksi. Graha Ilmu.

Subiyanto, B. (2017). Teknik pertambangan dan alat berat. Deepublish.

Widodo, A., & Riyadi, E. (2018). Analisis efektivitas penggunaan alat berat dengan metode OEE pada proyek infrastruktur. Jurnal Teknik Sipil dan Lingkungan, 4(1), 12–20.

Mulyono, S. (2020). Efisiensi pemakaian alat gali dan muat pada kegiatan penambangan batubara. Jurnal Teknologi Mineral dan Batubara, 16(2), 105–112.

Suharto, R. (2019). Pengaruh kondisi medan terhadap kinerja alat berat pada tambang terbuka. Jurnal Ilmu Teknik Pertambangan, 8(3), 45–52.

Kementerian Energi dan Sumber Daya Mineral. (2018). Keputusan Menteri ESDM Nomor 1827 K/30/MEM/2018 tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan yang Baik.

Downloads

Published

2025-06-26

How to Cite

Ruslan Patur, Harjuni Hasan, Henny Magdalena, Shalaho Dina Devi, Ardhan Ismail, & Tommy Trides. (2025). Evaluasi Unjuk Kerja Alat Gali-Muat pada Kegiatan Penambangan Batubara di PT. Insani Bara Perkasa Site Kam 11 Loajanan Kalimantan Timur. Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan, 3(3), 45–57. https://doi.org/10.61132/globe.v3i3.950

Similar Articles

<< < 1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>