The Role of Scheduling in Reducing Delays in Infrastructure Projects
DOI:
https://doi.org/10.61132/konstruksi.v3i2.774Keywords:
Critical Path Method, MS Project, Infrastructure Delays, Primavera P6, Project SchedulingAbstract
Large delays in infrastructure projects may lead to budget overruns, worse quality, and stakeholder dissatisfaction. This study examines scheduling tools and methods to decrease delays in large infrastructure projects. It compared Primavera P6 and MS Project projects with traditional scheduling methods. Detailed case studies indicate that improved scheduling improves project timetables, resource allocation, and cost management. Results demonstrate that advanced scheduling may boost project productivity and save delays by 50%. At the study's conclusion, risk management, real-time tracking, and critical path analysis were suggested for scheduling.
References
Al-Attar, I. (n.d.). Construction project management and professional relationships.
Hares, R. H., & Hares, F. (n.d.). Construction management.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Heldman, K. (2018). Project management jumpstart. John Wiley & Sons.
Johnson, P., & Lee, K. (2018). Integration of risk management and scheduling in large infrastructure projects. Procedia Engineering, 212, 123–130.
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Leach, L. P. (2014). Critical chain project management. Artech House.
Lock, D. (2020). The essentials of project management.
Microsoft Corporation. (2020). MS Project documentation.
Mubarak, S. A. (2015). Construction project scheduling and control. John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2020). Project management for engineering, business and technology. Routledge.
O’Brien, J. J. (1993). CPM in construction management.
Oracle Corporation. (2019). Primavera P6 Professional Project Management.
Pilcher, R. (1992). Principles of construction management.
Smith, J., & Brown, L. (2020). A comparative analysis of project scheduling techniques. International Journal of Project Management, 38(4), 567–580. https://doi.org/10.xxxx/ijpm.2020.xxxx
Williams, R. (2019). Impact of delays on construction projects and mitigation strategies. Journal of Construction Engineering and Management, 145(6), 04019045.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.