Evaluasi Produksi Overburden Menggunakan System Six Big Losses pada Pit K1 Mahakam PT. Insani Baraperkasa Kecamatan Loa Janan Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur

Authors

  • Nurhamidah Nurhamidah Universitas Mulawarman
  • Harjuni Hasan Universitas Mulawarman
  • Ardhan Ismail Universitas Mulawarman

DOI:

https://doi.org/10.61132/venus.v3i5.1164

Keywords:

Operational Efficiency, Operational Losses, Overburden, Production Evaluation, Six Big Losses

Abstract

Overburden removal is a critical phase in coal mining operations, as it directly affects production continuity and operational efficiency. However, production realization often deviates from the mine plan due to various operational constraints. This study, conducted at Pit K1 Mahakam of PT. Insani Baraperkasa, evaluates the causes of underachievement in overburden stripping targets using the Six Big Losses framework, which classifies inefficiencies into Breakdown Losses, Setup and Adjustment Losses, Idling and Minor Stops, Reduced Speed Losses, Process Defect Losses, and Reduced Yield Losses. The analysis revealed that the dominant losses were Reduced Speed Losses (26%) and Setup and Adjustment Losses (10%), primarily caused by disposal congestion, shift changes, and repairs at the loading and disposal areas. Minor contributions were found from idling (3%), production losses (5%), while breakdown losses showed negligible impact. These factors led to increased standby time and reduced equipment cycle effectiveness. Improvement strategies are recommended through optimized disposal allocation, reduction of waiting time, and stricter control of external operational disruptions to enhance stripping efficiency and achieve production targets.

References

Agustino, Y. (2018). Evaluasi optimalisasi alat gali muat dengan metoda Overall Equipment Effectiveness (OEE) untuk memenuhi target produksi batubara bulan Maret 2018 di Pit 1 Utara Bangko Barat PT. Bukit Asam Tbk, Tanjung Enim Sumatera Selatan. Jurnal Bina Tambang, 3(4).

Akande, M. J. (2013). Optimization of the overall equipment efficiency (OEE) of loaders and rigid frame trucks in NAMDEB Southern Coastal Mine Stripping fleet, Namibia. Science P.G., 2(6), 158-166. https://doi.org/10.11648/j.earth.20130206.17

Indonesianto, Y. (2007). Pemindahan tanah mekanis. Jurusan Teknik Pertambangan, Fakultas Teknologi Mineral, UPN "Veteran" Yogyakarta, Yogyakarta.

Kusnama, E., Santoso, E., & Novianti, Y. S. (2021). Kajian teknis ketidaksesuaian antara rencana penambangan dengan kondisi aktual di tambang batubara PT Senamas Energindo Mineral Site Jaweten, Kabupaten Barito Timur, Provinsi Kalimantan Tengah. Jurnal Himasapta, 6(1), 51-56. https://doi.org/10.20527/jhs.v6i1.3441

Nakajima, S. (1998). Introduction to total productive maintenance. Productivity.Inch, Cambridge.

Nuryono, A. (1998). Analisis efektivitas kinerja excavator pada aktivitas overburden removal penambangan batubara menggunakan metode OEE studi kasus PT. RML Embalut - Kalimantan Timur. Productive Maintenance, Journal Operations Excellence, 17(2).

Prodjosumarto, P. (1996). Pemindahan tanah mekanis. Bandung: Institute Teknologi Bandung.

Sigit, G. (2019). Pengukuran nilai Overall Equipment Effectiveness (OEE) dan analisis six big losses studi kasus (PT Sunardi Mekar Jaya Readymix Yogyakarta, Universitas Islam Bandung, Yogyakarta.

Susanto, A., & Yulhendra, D. (2024). Analisis pencapaian produksi terhadap rencana sekuen penambangan PT Baramutiara Prima, Desa Sri Gunung, Kecamatan Sungai Lilin, Kabupaten Musi Banyuasin, Provinsi Sumatera Selatan. Journals Mining Engineering Bina Tambang, 9(1).

Suwandi, A. (2001). Optimalisasi produksi alat berat. Badan Pendidikan dan Pelatihan Energi dan Sumberdaya Mineral, Pusat Pendidikan dan Pelatihan Teknologi Mineral dan Batubara, Departemen Energi dan Sumber Daya Mineral RI, Bandung.

Syifan, I. (2021). Analisis efektivitas mesin menggunakan metode Overall Equipment Effectiveness (OEE) untuk meningkatkan produktivitas line assembly propeller shaft 2 joint (studi kasus: PT. Inti Ganda Perdana). Fakultas Teknologi Industri, Universitas Islam Indonesia.

Tenriajeng, A. T. (2003). Pemindahan tanah mekanis. Gunadarma, Jakarta.

Wawang, S. (2023). OEE demistifikasi. PT. Mitra Prima Prima Produktivitas, Bekasi.

Winarno, E. (2018). Kajian teknis produksi alat muat dan alat angkut pada pengupasan overburden. Jurnal Teknologi Pertambangan, 4(2).

Zulkarnain, F. (2020). Pemindahan tanah mekanis dan peralatan konstruksi. Umsu Press, Medan.

Downloads

Published

2025-10-30

How to Cite

Nurhamidah, N., Harjuni Hasan, & Ardhan Ismail. (2025). Evaluasi Produksi Overburden Menggunakan System Six Big Losses pada Pit K1 Mahakam PT. Insani Baraperkasa Kecamatan Loa Janan Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur . Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 3(5), 156–171. https://doi.org/10.61132/venus.v3i5.1164