Estimasi Biaya Overburden Removal menggunakan Metode Owning Cost dan Operating Cost di PT. Pancaran Surya Abadi Kalimantan Timur
DOI:
https://doi.org/10.61132/venus.v4i2.1432Keywords:
Mechanical Equipment, Mining Cost, Operating Cost, Overburden Removal, Owning CostAbstract
Overburden removal is a critical stage in coal mining that requires effective cost management to achieve production targets optimally. The large volume of material moved makes overburden stripping costs the largest cost component in mining operations, while technical conditions such as hauling distance, haul road conditions, and mechanical equipment work efficiency also influence operational costs. This study aims to calculate the cost estimation of overburden removal in the Third Quarter using the owning cost and operating cost methods at PT Pancaran Surya Abadi, East Kalimantan, using primary data consisting of cycle time and swell factor, and secondary data including working hours, repair hours, equipment specifications, fuel consumption, fuel prices, and operator costs. The analysis was conducted by calculating mechanical equipment productivity, equipment availability, and equipment ownership and operating costs. The results show that the productivity of the DEVELON DX530LC-7M Excavator was 343.97 BCM/hour and the Zoomlion ZT115A Dump Truck was 83.36 BCM/hour, with total operational costs of US$ 81,400.97 in July, US$ 79,194.15 in August, and US$ 79,027.29 in September, with a stable production cost of US$ 0.98/BCM. The largest cost component came from the use of the Zoomlion ZT115A Dump Truck, and the owning cost and operating cost methods proved effective in estimating overburden removal costs as a basis for evaluating mining operational efficiency.
References
Arif, I. (1996). Diktat kuliah: Tambang terbuka. Institut Teknologi Bandung.
Bargawa, W. S. (2010). Perencanaan tambang. Jurusan Teknik Pertambangan, UPN “Veteran” Yogyakarta.
Ekky, S., Zaenal, & Widayati, S. (2017). Kajian biaya kepemilikan (owning cost) dan biaya operasi (operating cost) pada peralatan penambangan batuan andesit di PT Panghegar Mitra Abadi, Block Gunung Gadung, Kampung Cikuya Desa Lagadar, Kecamatan Margaasih, Kabupaten Bandung Provinsi Jawa Barat. Prosiding Teknik Pertambangan. Universitas Islam Bandung.
Gentry, T. J. O. (1984). Mine investment analysis. Society of Mining Engineers of the American Institute of Mining, Metallurgical, and Petroleum Engineers Inc.
Hustrulid, W., Kuchta, M., & Martin, R. (2006). Open pit mine planning and design: Fundamentals (Vol. 1, 3rd ed.). Taylor & Francis.
Indonesianto, Y. (2012). Pemindahan tanah mekanis. Jurusan Teknik Pertambangan, UPN “Veteran” Yogyakarta.
Jaya, M. S., Tuheteru, E. J., & Purwiyono, T. T. (2024). Kajian pengaruh geometri jalan angkut untuk ketercapaian target produksi alat angkut pada pemindahan overburden di PT Mitra Barito Lumbung Energi. Indonesian Mining and Energy Journal, 7(2), 62–67.
Jaya, M. S., Tuheteru, E. J., & Purwiyono, T. T. (2024). Kajian pengaruh geometri jalan angkut untuk ketercapaian target produksi alat angkut pada pemindahan overburden di PT Mitra Barito Lumbung Energi. Indonesian Mining and Energy Journal, 7(2), 62–67.
Menteri Pertambangan dan Energi. (2018). Keputusan Menteri Pertambangan dan Energi Nomor 1827 K/26/MEM/2018 tentang keselamatan dan kesehatan kerja pertambangan umum. Menteri Pertambangan dan Energi.
Pangetui, D. C., Fadila, A., & Nugraheni, S. (2022). Rupiah exchange rate fluctuations in the US dollar: Purchasing power parity theory and Fisher effect theory testing. Nominal: Barometer Riset Akuntansi dan Manajemen, 11(1), 57–69. https://doi.org/10.21831/nominal.v11i1.42982
Partanto, P. (2000). Pemindahan tanah mekanis. Departemen Teknik Pertambangan, Institut Teknologi Bandung.
PT Pancaran Surya Abadi. (2008). Laporan studi kelayakan PT Pancaran Surya Abadi, Tenggarong (Laporan tidak dipublikasikan).
Rahman Afdhansyah, R. I., dkk. (2025). Analisis investasi tambang: Strategi, risiko, dan peluang. PT Pustaka Briliant Lestari.
Setiarini, N. P., Soerjodibroto, M., & Milawarma. (2022). Analisis pengaruh produksi alat gali-muat dan alat angkut terhadap biaya coal getting di Pit Durian PT Jambi Prima Coal. Jurnal Inovasi Pertambangan dan Lingkungan, 1(2), 81–91.
Syah, E. J. (2024). Analisis perbandingan biaya produksi pada kegiatan penggalian dan pengangkutan batubara PT Victor Dua Tiga Mega (Skripsi sarjana). Universitas Islam Negeri Syarif Hidayatullah Jakarta.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Venus: Jurnal Publikasi Rumpun Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.