Tinjauan Manajemen Proyek Dalam Penentuan Skala Prioritas Pembangunan Jalan Di Kabupaten Kaur

Authors

  • Yunita Mauliana Universitas Sang Bumi Ruwa Jurai

DOI:

https://doi.org/10.61132/venus.v1i6.198

Keywords:

Kaur Selatan, Maje, Road Development, Priority Scale

Abstract

Regency roads are local roads which do not include roads connecting the district capital to other districts, but their network is diverse as a link for local activities, namely connector roads between villages, between sub-districts, production center roads and environmental roads in residential areas. This research focuses on roads in Kaur Selatan District and Maje District, Kaur Regency, Bengkulu Province with a total length of 128.50 km with a total of 68 sections. There are several sub-district roads which are a road network that is integrated with national roads. In general, this road section is often used by various types of vehicles, from light to heavy vehicles. Utilization of roads that do not match their class and the influence of the weather climate in areas that are quite extreme result in landslides so that the road body becomes narrow and heavily damaged. As a result of damage to existing roads, community activities are hampered. The purpose of this research is to provide information to the Bengkulu Regency government in preparing priority planning, determining the type of pavement that is appropriate to the location of the road section and determining the calculation of the costs required. The results of research and calculations show that the cost required for road repairs is IDR. 70,788,844,000 for a period of 5 years. The priority scale consists of 17 sections with a cost of Rp. 57,541,204,000.

References

Direktorat Jenderal Bina Marga. (n.d.). Buku Kondisi Jalan Nasional 2021.

Dinas PUPR Kabupaten Kaur 2021

Ervianto, Wulfram. I. (2004). Teori – Aplikasi Manajemen proyek kontruksi, Penerbit Andi. Yogyakarta

Gilang Wening Avanda (2019). Pembuatan Jadwal ulang ( Rescheduling) Proyek dengan metode Pert. Tugas Akhir. Universitas Islam Indonesia. Yogyakarta

Guide, P. (2008). A guide to the project management body of knowledge.

Undang-Undang No. 38 Tahun 2004 tentang Jalan.

Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Oglesby, C. H., & Hicks, R. G. (1999). Jalan Raya. Erlangga.

SK Bupati Kabupaten Kaur Nomor : 188.4.45.423 Tahun 2018

Downloads

Published

2023-12-31

How to Cite

Yunita Mauliana. (2023). Tinjauan Manajemen Proyek Dalam Penentuan Skala Prioritas Pembangunan Jalan Di Kabupaten Kaur. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 1(6), 34–43. https://doi.org/10.61132/venus.v1i6.198

Similar Articles

<< < 1 2 3 4 

You may also start an advanced similarity search for this article.