Analisis Beban Industri pada Penyulang Kima di PT. PLN (Persero) ULP Daya UP3 Makassar Utara

Authors

  • Suryani Suryani Universitas Muhammadiyah Makassar
  • Muhammad Sukri Zaenal Universitas Muhammadiyah Makassar
  • Abdul Hafid Universitas Muhammadiyah Makassar

DOI:

https://doi.org/10.61132/venus.v2i5.530

Keywords:

Electric Load, Load Imbalance, Repeater

Abstract

Energy Electricity is something that is needed in people's lives, the need for electrical energy is increasing. the need for electrical energy is increasing. demand for electrical energy continues to increase along with economic growth and community welfare. the welfare of society. The growth in demand for electrical energy is influenced by the development of the growing manufacturing and industrial sectors. This study aims to determine the energy imbalance between the industrial and general power lines on the reliability of the 20 kV network. Methods research methods used in this study are primary and secondary research. secondary research. The results obtained in this study are the imbalance of load on the 20 kV power load on the 20 kV industrial repeater transformer power at the time of high loading during the day is 192.4633333 A with a percentage of the power of the 20 kV network. day 192.4633333 A with a percentage of 0.556252408 % and the lowest general repeater load of 68.45 A with a load percentage of 0. %percentage of 0.197919075%.

 

 

References

Agus, S., Marthinus, P., & Meita, R. (2015). Kajian perencanaan kebutuhan dan pemenuhan energi listrik di Kota Madano. Journal Teknik Elektro dan Komputer, ISSN: 2301-8402.

Apriyani, S. S., Jacob, J. R., & Elisabeth, T. M. (2021). Peramalan beban penyulang Passo PT. PLN (Persero) Area Ambon menggunakan metode regresi linier berganda. ELKO (Elektrical dan Komputer), 2.

Fedwina, F. L., H. T., & Silimang, S. (2021). Perencanaan jaringan distribusi tenaga listrik 20 kV di Universitas Sam Ratulangi.

Herawan, M. R. (2020). Analisis kehandalan kinerja penyulang 20 kV di PT. PLN (Persero) Distribusi Jawa Barat Area Cirebon Rayon Ciledug. Bandung.

Indra, M. H., Suzantry, H. Y., & Priyadi, I. (2022). Pengujian tahanan isolasi pada transformator distribusi 160 kVA di PT. PLN (Persero) UP3 Bengkulu, 12.

Kevin, M. G., Hans, T., & Sartje, S. (2021). Analisis indeks keandalan sistem distribusi tenaga listrik berdasarkan SAIDI dan SAIFI pada PT. PLN (Persero) Area Minahasa Utara. Journal Teknik Elektro, 1-9.

Manopo, K. G., Tumaliang, H., & Silimang, S. (n.d.). Analisis indeks keandalan sistem distribusi tenaga listrik berdasarkan SAIFI dan SAIDI pada PT. PLN (Persero) Area Minahasa Utara.

Musdir, N. A., Arief, A., & Nappu, M. B. (2022). Penerapan distributed generation optimal mempertimbangkan rekonfigurasi jaringan. Jurnal EKSITASI, 1(2).

Nanang, S., Sumpena, M., & Agus Sugiharto, S. (2022). Analisis konsumsi daya dan distribusi tenaga listrik. Journal Universitas Suryadarma, 1-5.

Ramadoni, S. (2021). Transmisi dan distribusi tenaga listrik.

Senen, A., Ratnasari, T., & Anggaini, D. (2019). Studi perhitungan indeks keandalan sistem tenaga listrik menggunakan graphical user interface Matlab pada PT. PLN (Persero) Rayon Kota Pinang. Energi & Kelistrikan, 11(2), 138–148. https://doi.org/10.33322/energi.v11i2.497

Sukri, A. S., Rikumahu, J. J., & Mbitu, E. T. (2021). Peramalan beban penyulang Posso PT. PLN (Persero) Area Ambon menggunakan metode regresi linier berganda.

Wibowo, P. F. (2016). Sistem BCU (Bay Control Unit) pada sistem otomasi gardu induk Purbalingga 150 kV. PUIL 2000.

Published

2024-08-26

How to Cite

Suryani Suryani, Muhammad Sukri Zaenal, & Abdul Hafid. (2024). Analisis Beban Industri pada Penyulang Kima di PT. PLN (Persero) ULP Daya UP3 Makassar Utara. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 2(5), 55–62. https://doi.org/10.61132/venus.v2i5.530