Identifikasi Pemporosan pada Lini Proses Logistik Hotel PYX dengan Value Stream Mapping
DOI:
https://doi.org/10.61132/jupiter.v4i1.1297Keywords:
Hotel, Lean, PAM, VSM, WasteAbstract
This study aims to identify and minimize waste in the process of procuring Food & Beverage raw materials at Hotel PXY Jasa Bali using the Lean Inventory Management approach. Observations over one month showed that the total procurement cost reached 47% of the total revenue, exceeding the ideal limit of 35%. One of the main causes is the inefficient and lack of synchronization between divisions in the Rhapsody platform, which causes waste in the form of defects, delays, over-processing, and transportation. This study uses the Value Stream Mapping (VSM) method to map actual conditions and Process Activity Mapping (PAM) to identify the type of activity based on the waste category. In addition, root cause analysis is carried out using the Root Cause Analysis (RCA) approach. The mapping results showed that out of the total lead time of 598.44 minutes, only 278.49 minutes or 46.54% were value-added activities. This finding indicates that the procurement process is not yet efficient and needs optimization. Several recommendations were given to minimize waste, such as clearer division of tasks, improved communication with vendors, and the procurement of supporting facilities to reduce physical movement between divisions. The implementation of this lean service is expected to be able to increase the efficiency of the logistics process and reduce the company's overall operational costs.
References
Achuora, J. O., & Robert, A. (2020). Lean Inventory Management Systems and Performance of Supermarkets in Nairobi County, Kenya. European Journal of Business and Management Research, 5(2). https://doi.org/10.24018/ejbmr.2020.5.2.280
Antonny Alvin Christianus. (2022). Implementasi Sistem Just In Time Dalam Meningkatkan Optimalisasi MCE Dan Produktivitas Kerja. 12–26.
Arunizal, S., Wardhani, D. H., & Windarta, J. (2024). Penerapan Value Stream Mapping ( VSM ) untuk Menurunkan Lead Time Process dan Meningkatkan Kinerja Aktivitas Pengadaan di Site Tambang. 2(3), 141–150.
Bashir, H., Shamsuzzaman, M., Haridy, S., & Alsyouf, I. (2020). Lean warehousing: A case study in a retail hypermarket. Proceedings of the International Conference on Industrial Engineering and Operations Management, 0(March), 1599–1607.
Borucka, A. (2023). Seasonal Methods of Demand Forecasting in the Supply Chain as Support for the Company’s Sustainable Growth. Sustainability (Switzerland), 15(9). https://doi.org/10.3390/su15097399
Envanter, Y. Y. ile. (2023). Reducing Wastage in Inventory Management by Lean Management. Turkish Academic Research Review - Türk Akademik Araştırmalar Dergisi [TARR], 8, 1014–1041.
Febianti, E., Kulsum, K., Pratama, A. R., Herlina, L., Kurniawan, B., Ilhami, M. A., Mutaqin, A. I. S., Muharni, Y., & Wulandari, A. (2022). Implementasi Lean Service Dengan Metode WAM dan VALSAT Untuk Meminimasi Waste Pada Loading Steel Plate. Journal of Systems Engineering and Management, 1(1), 15. https://doi.org/10.36055/joseam.v1i1.17538
Firdausi Amaliyah, & Taufik Kurniawan. (2024). Implementasi Lean Inventory Management dalam Mengurangi Biaya Persediaan di Perusahaan Manufaktur. Kajian Ekonomi Dan Akuntansi Terapan, 1(3), 129–149. https://doi.org/10.61132/keat.v1i3.328
Hamdan, N. R., & Hossain, A. M. (2022). Applying of Lean Management to Increase Organization Efficiency: “ABC” Plant Case Study. The International Journal of Science & Technoledge, 10(5). https://doi.org/10.24940/theijst/2022/v10/i5/st2205-001
Jakfar, A., Setiawan, W. E., & Masudin, I. (2015). Reducing Waste Dengan Menggunakan Pendekatan Lean Manufacturing. Spektrum Industri, 13.
Kumar, N., Shahzeb Hasan, S., Srivastava, K., Akhtar, R., Kumar Yadav, R., & Choubey, V. K. (2022). Lean manufacturing techniques and its implementation: A review. Materials Today: Proceedings, 64(April), 1188–1192. https://doi.org/10.1016/j.matpr.2022.03.481
Moengin, P., & Ayunda, N. (2021). Lean Manufacturing untuk Meminimasi Lead Time dan Waste agar Tercapainya Target Produksi (Studi kasus: PT. Rollflex Manufacturing Indonesia). Jurnal Teknik Industri, 11(1), 77–92. https://doi.org/10.25105/jti.v11i1.9699
Mukti Ali Sadikin. (2023). Defect Reduction in The Manufacturing Industry: Systematic Literature Review. International Journal of Industrial Engineering and Engineering Management, 5(2), 73–83. https://doi.org/10.24002/ijieem.v5i2.7495
Mustari Is Haq, K. (2016). VALUE STREAM ANALYSIS TOOL (VALSAT) APPLICATION TO REDUCE THE PROCUREMENT & PLANNING PROCESS TIME OF TURNAROUND SPAREPART (CASE STUDY: PHONSKA IV PT. PETROKIMIA GRESIK) (Doctoral Dissertation). 1–122.
Natalia, M., & Sutapa, N. (2016). Penurunan Waste Intra pada Transportation Process Menggunakan Value Stream Mapping: A Case Study. Jurnal Tirta, 4(2), 58–64.
Rahman, A. A. (2023). Penerapan Sistem Produksi Just In Time (JIT) Untuk Meningkatkan Kinerja Produksi Sesuai Permintaan Di Bengkel Agus Las.
Sable, C. S., & Dakhore, M. M. (2016). aste in Production by Lean Thinking. 3(6), 381–386.
Sangga, P., & Insanita, R. (2022). Penerapan Praktik Lean Service Melalui Value Stream Mapping pada Departemen Food and Beverage Service Hotel X. Jurnal Manajemen Dan Usahawan Indonesia, 45(2), 94–110.
Santoso, S., Nurhidayat, R., Mahmud, G., & Arijuddin, A. M. (2021). Measuring the Total Logistics Costs at the Macro Level: A Study of Indonesia. Logistics, 5(4). https://doi.org/10.3390/logistics5040068
Suparno, A., Kholil, M., Sa’diyah, F., & H Hasan, S. Bin. (2021). Implementation of Lean Manufacturing and Waste Minimization to Overcome Delay in Metering Regulating System Fabrication Process using Value Stream Mapping and VALSAT Method Approach (Case Study: Company YS). International Journal of Advanced Technology in Mechanical, Mechatronics and Materials, 2(1), 22–34. https://doi.org/10.37869/ijatec.v2i1.41
Swantoro, H. A., Zaman, A. N., Safitri, M. W., Wulandari, R., Industri, T., Pembangunan, U., & Veteran, N. (2020). Penerapan Lean Manufacturing di PT. Pipa Mas Putih, Batam. 16, 11–15.
Turseno, A. (2018). Proses Eliminasi Waste Dengan Metode Waste Assessment Model & Process Activity Mapping Pada Dispensing. Journal Industrial Manufacturing, 3(1). https://doi.org/10.31000/jim.v3i1.619
Vasconcellos, L. H. R., Sampaio, M., & Fonseca, H. (2022). Pull Production Implementation: An Action Research Study. Revista de Administracao Contemporanea, 26(6), 1–25. https://doi.org/10.1590/1982-7849rac2022210151.en
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.