Journal Metric & Achievement |
E-ISSN .: 3031-349X :. |
![]() |
P-ISSN .: 3031-500X :. |
![]() |
Submissions |
How to Submit |
Copyright Notice |
Privacy Statement |
About This Journal |
History |
Focus and Scope |
Peer Review Process |
Publication Ethics |
Open Access Policy |
Indexing |
Archive Policy |
Open Access Statement |
Repository policy |
Journal License |
Policy of Plagiarism |
Article Processing Charge |
People |
Editorial Team |
Peer-Reviewers |
Publisher |
Contact |
For Author |
Author Guidelines |
Publication Frequency |
Manuscript template (DOC) |
Download Articles |
Vol 1 No 6 November 2023 |
Vol 2 No 1 January 2024 |
Vol 2 No 2 March 2024 |
Vol 2 No 3 May 2024 |
Vol 2 No 4 July 2024 |
Vol 2 No 5 September 2024 |
Vol 2 No 6 November 2024 |
Vol 3 No 1 January 2025 |
Contact |
![]() |
Visitors |
About the Journal
Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika. is a journal devoted to the publication of scientific articles published by the Indonesian Engineering Science Research Association. This journal is a peer-reviewed and open Industrial Engineering Science Cluster Research journal. This journal is a peer-reviewed and open research journal of the Engineering Science Clump. The fields of study in this journal include the Industrial Engineering, Electrical and Computer Engineering sub-groups. This journal is published 1 year 6 times (January, March, May, July, September and November)
Current Issue

Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika. is a journal devoted to the publication of scientific articles published by the Indonesian Engineering Science Research Association. This journal is a peer-reviewed and open Industrial Engineering Science Cluster Research journal. This journal is a peer-reviewed and open research journal of the Engineering Science Clump. The fields of study in this journal include the Industrial Engineering, Electrical and Computer Engineering sub-groups. This journal is published 1 year 6 times (January, March, May, July, September and November)
Articles
-
Percepatan Proyek pada Schedule Penjadwalan Kapal Perang dengan Precedence Diagram Method di Perusahaan Galangan Kapal Surabaya
DOI : https://doi.org/10.61132/jupiter.v3i2.766
- PDF Views: 53 times | Download : 26 times
-
Analisis Perhitungan Kebutuhan Sistem pada Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Rumah Tangga 900 Watt
DOI : https://doi.org/10.61132/jupiter.v3i2.778
- pdf Views: 30 times | Download : 37 times
-
Strategi Manajemen Risiko Teknologi Informasi Berbasis Studi Literatur
DOI : https://doi.org/10.61132/jupiter.v3i2.780
- pdf Views: 10 times | Download : 4 times
-
Analisa Risiko K3 dengan Metode Job Safety Analysis (JSA) dan Risk Assessment pada Proses Mesin Sizing di PC GKBI Medari Sleman
DOI : https://doi.org/10.61132/jupiter.v3i2.781
- pdf Views: 33 times | Download : 16 times
-
Desain dan Implementasi Sistem Penyiraman Otomatis Berbasis IoT Menggunakan Mikrokontroler ESP
DOI : https://doi.org/10.61132/jupiter.v3i2.762
- pdf Views: 12 times | Download : 5 times
-
Pemilihan Supplier Urea Menggunakan Metode Analytic Network Process (Studi Kasus di PT. Delta Setia Sandang Asli Tekstil 1)
DOI : https://doi.org/10.61132/jupiter.v3i2.791
- pdf Views: 13 times | Download : 2 times
-
Rancang Bangun Alat Pemotong Kerupuk Terasi dengan Menggunakan Senar Gitar
DOI : https://doi.org/10.61132/jupiter.v3i2.792
- pdf Views: 15 times | Download : 6 times