Analisis Model Pengaturan Relay Arus Lebih dan Relay Gangguan Tanah Saluran Tegangan Tinggi di Gi Miwon Ke PT Daesang

Authors

  • Abdul Muta’ali Universitas Islam Malang
  • Hifdillah Kharisma Muhammad Universitas Islam Malang

DOI:

https://doi.org/10.61132/jupiter.v3i1.681

Keywords:

Relay coordination, overcurrent relay, ground fault relay, GI

Abstract

Power system protection plays a crucial role in maintaining the reliability and security of electricity distribution. This study discusses the analysis of coordination between overcurrent relays (OCR) and ground fault relays (GFR) on the Miwon Substation power line. The study aims to determine the optimal setting values ​​for OCR and GFR, so that they can detect and disconnect short circuit faults quickly and accurately. The approach used includes theoretical calculations and simulations to evaluate relay performance under various fault conditions. The results of the study reveal that with appropriate settings, the relay can operate selectively and efficiently, reducing the impact of disturbances and maintaining the stability of the power system.

References

A. Jamaah, “EVALUASI SETTING RELE JARAK GARDU INDUK UNGARAN JARINGAN 150kV ARAH

C. Rizal and A. Azis, “Analisa Setting Relai Arus Lebih (OCR) Dan Relai Gangguan Tanah (GFR) Pada Penyulang Gurami Gardu Induk Sungai Kedukan Palembang,”J. Ampere, vol. 7, no. 1, pp. 49–62, 2022 [Online].Available: http://doi.org/10.31851/ampere

E. S. Nasution et al., “Rele diferensial sebagai proteksi pada transformator daya pada gardu induk,” pp. 179–186, 2015.

E.Dermawan dan D.Nugroho, “Analisa Koordinasi Over Current Relay Dan Ground Fault Relay Di Sistem Proteksi Feeder Gardu Induk 20 kV Jababeka,” J. Elektum, vol. 14, no. 2, pp. 43–48, 2021, [Online]. Available: https://jurnal.umj.ac.id/index.php/elektu m/article/view/1737/1464

F. Mangkusasmito, E. Ariyanto, and M. Syafruddin, “Simulasi Pengaman Pada Saluran Kabel Tegangan Tinggi Berupa Line Current Differential (LCD) Berbasis Arduino Mega 2560 Dengan Tampilan Human Machine Interface dan Notifikasi Blynk,” Epsil. J. Electr. Eng. Inf. Technol., vol. 19, no. 3, pp. 79–84,2022,doi: 10.55893/epsilon.v19i3.73.

KRAPYAK-2,” Orbith, vol. 10, no. 1, pp. 82–89, 2014.

Saputra, H. Khumaini, and A. Azkiya, “Perancangan Alat Monitoring Arus Pada Circuit Breaker Dengan Sensor Acs712 Menggunakan Tampilan Lcd,” Informatika, vol. 14, no. 2, p. 86, 2023, doi: 10.36723/juri.V142-.505.A.

Sugiarto, “Pemakaian Dan Pemeliharaan Transformator Arus (Current Transformer/CT),” Forum Teknol., vol. 05, no. 1, pp. 1–7, 2015.

W. Hidayat, H. Gusmedi, L. Hakim, and D. Despa, “Analisa Setting Rele Arus Lebih dan Rele Gangguan Tanah pada Penyulang Topan Gardu Induk Teluk Betung,” Electr. J. Rekayasa dan Teknol. Elektro, vol. 7, no. 3, pp. 108–115, 2013, [Online]. Available: https://electrician.unila.ac.id/index.php/ ojs/article/view/116

Downloads

Published

2025-01-03

How to Cite

Abdul Muta’ali, & Hifdillah Kharisma Muhammad. (2025). Analisis Model Pengaturan Relay Arus Lebih dan Relay Gangguan Tanah Saluran Tegangan Tinggi di Gi Miwon Ke PT Daesang. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro Dan Informatika, 3(1), 146–154. https://doi.org/10.61132/jupiter.v3i1.681