Pelaksanaan Pengecoran Saluran Peluncur Bangunan Pelimpah Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat
DOI:
https://doi.org/10.61132/konstruksi.v3i2.1099Keywords:
Work Methods, Concrete Casting, Launch Channel, Spillway Structure, Cijuray DamAbstract
The major work of the Cijurey Dam Project Package III is located in Bogor Regency, West Java Province, which is a spillway structure consisting of iron structures and concrete structures. To achieve the right quality, on time, on cost, and zero accidents, concrete casting calculations and appropriate work implementation methods are required. This research method uses descriptive with quantitative and qualitative approaches. The stages of concrete casting work for the Cijurey Dam spillway structure's launch channel consist of preparation, measuring the launch channel block boundaries, lean concrete work, reinforcement work, formwork panel preparation, formwork panel installation, waterstop and dowel bar work, concrete sampling and slump test, concrete casting, concrete curing/maintenance, formwork dismantling, and finishing of tierod holes. The results of the study showed that the calculations for casting the concrete channel were a large volume of concrete channel casting of 135,000 m3, concrete material requirements (in the form of: 1,115,100 sacks of cement, 58,050 m3 of sand, 1,020,600 m3 of gravel, and 29,025,000 liters of water), channel formwork (surface area) of 27,675 m2, productivity of casting the concrete channel launcher of 24 m3/hour or 193 m3/day, and the efficiency of casting the concrete channel launcher time of around 125% (25% faster than planned). Meanwhile, the stages of work implementation for channel concrete casting include preparation work, measurement work for the boundaries of the launcher channel blocks, lean concrete work, reinforcement work, formwork panel preparation work, formwork lubrication work, formwork panel installation work, waterstop and dowel bar work, concrete sampling and slump test work, channel concrete casting work, concrete curing/maintenance work, formwork dismantling work, and finishing work for tierod holes. In addition, an inter-segment locking system with a shear key is used to overcome problems with the concrete pump, joint inspections are carried out during mobilization, routine inspections, repairs and replacement of the concrete pump.
References
Alam, R. R. R. (2018). Kajian hidrolika pelimpah samping pada model fisik Bendungan Pasuruhan Kabupaten Magelang Provinsi Jawa Tengah dengan skala 1:60 (Skripsi, Universitas Brawijaya). Universitas Brawijaya Repository. http://repository.ub.ac.id/id/eprint/12870
Ernawan, D., & Raspati, A. D. (2024). Investigasi kebutuhan rehabilitasi konstruksi bangunan utama dan saluran primer D.I Nangewer Kabupaten Purwakarta. Jurnal Teknik Sipil Cendekia (JTSC), 5(2), 962–980. https://doi.org/10.51988/jtsc.v5i2.209
Ernawan, D., Indriani, D., Subandi, A., & Permana, E. S. (2025). Analisis perhitungan penerapan aditif SG dalam job mix formula terhadap efisiensi dan konsistensi mutu beton program studi teknik sipil Fakultas Teknik Universitas Subang, Indonesia Waskita Beton Precast Tbk - Plant Subang salah satu sebuah perusahaan ya. Jurnal Kendali Teknik dan Sains, 3(3), 263–276.
Ismail, A., & Hamdi, F. (2023). Analisis kavitasi pada saluran peluncur pelimpah Bendungan Karalloe. Jurnal Teknik Sipil, 9(1), 10–16. http://ejournal.um-sorong.ac.id/index.php/rancangbangun/article/view/2346/1343
Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR). (2015). Standar dan pedoman pengadaan pekerjaan konstruksi dan jasa konsultansi (pp. 1–10). Direktorat Jenderal PUPR. https://jdih.pu.go.id/detail-dokumen/547/1#div_cari_detail
Maidah, A., Suprapto, B., & Rokhmawati, A. (2020). Studi perencanaan bangunan pelimpah (spillway) pada Bendungan Semantok Kecamatan Rejoso Kabupaten Nganjuk. Jurnal Rekayasa Sipil, 8(4), 271.
Mubarokah, N., Rachman, L. M., & Tarigan, S. D. (2020). Analysis of carrying capacity of crop agricultural land in Cibaliung Watershed, Banten Province. Jurnal Ilmu Pertanian Indonesia, 25(1), 73–80. https://doi.org/10.18343/jipi.25.1.73
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat (PUPR). (2008). Pedoman pengawas penyelenggaraan dan pelaksanaan pemeriksaan konstruksi di lingkungan Departemen Pekerjaan Umum (pp. 1–153). Direktorat Jenderal PUPR.
Pontan, D. (2022). Manajemen proyek konstruksi: Konsep, strategi, dan praktik dalam teknik sipil (pp. 1–254). Media Penerbit Indonesia.
Prihandono, D. E., Mahadipta, N. G. D., & Putra, I. K. A. D. A. (2024). Manajemen efektif dalam proyek konstruksi.
Rahmadi, Y., Wesli, Sarana, D., & Akbar, S. J. (2018). Studi eksperimental beton normal dalam pencapaian kuat tekan beton. Teras Jurnal, 7(2), 284. https://doi.org/10.29103/tj.v7i2.135
Ruzuqi, R., Maryanto, E. T., & Rahmat, A. (2022). Kuat tarik baja tulangan polos. Jurnal Metiks, 2(1), 9–14.
Standar Nasional Indonesia (SNI) 03-2847. (2002). Tata cara perhitungan struktur beton untuk bangunan gedung (pp. 1–292). Badan Standardisasi Nasional.
Sutikno, S. (2023). Panduan praktek beton (pp. 1–254). Jurusan Teknik Sipil, Fakultas Teknik, Institut Teknologi Sepuluh Nopember.
Sutikno, S., Nurfalah, E., & Ernawan, D. (2025). Analisis pengendalian banjir di saluran sekunder irigasi Perot 2 di Desa Kosambi Kecamatan Cipunagara Kabupaten Subang. Jurnal Mesa, 9(1), 8–12.
Widodo, T. (2025). Irigasi perkuat langkah menuju swasembada pangan. Info GPTN. https://info.gptn.or.id/irigasi-perkuat-langkah-menuju-swasembada-pangan/
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.