Penerapan Time And Motion Study dalam Upaya Perbaikan Waktu pada Proses Produksi CV. JM PUTRA
DOI:
https://doi.org/10.61132/konstruksi.v3i4.1147Keywords:
Work Efficiency, Standard Time, Time and Motion Study, Productivity, FurnitureAbstract
This study aims to analyze work time efficiency and determine standard time in the furniture production process at CV. JM Putra using the Time and Motion Study method. The background of this study stems from the problem of low production time efficiency due to suboptimal work methods, ineffective work area layout, and a lack of systematic work time measurement. The research was conducted quantitatively and descriptively through direct observation, interviews, and time measurements using a stopwatch for the table production process, which consisted of five main activities. The results showed that the average total cycle time for one table unit was 347.25 minutes, with the activity of assembling the table frame being the longest activity at 120.13 minutes or about 34.6% of the total working time. After performance assessment and the addition of a 15.5% allowance factor, the standard time was obtained at 129.03 minutes. These results indicate that the activity of assembling the table frame is the most critical point that affects production efficiency. The implications of this study show the importance of improving work methods, area layout, and operator training to increase labor productivity. The application of standard time measurement results can be used as a basis for setting work standards, production capacity planning, and a more objective labor incentive system.
References
Adila, A., & Hidayat Riyanto, W. (2021). Fungsi Produksi pada Pabrik Gula Krebet Baru Malang. Economie: Jurnal Ilmu Ekonomi, 3(1), 42. https://doi.org/10.30742/economie.v3i1.1569
Aditya Aprodicto Bestafirli, & Joumil Aidil Saifuddin. (2024). Improvement Productivity Menggunakan Metode Time And Motion Study Pada Area Line F PT KHI. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 2(1), 77–88. https://doi.org/10.61132/venus.v2i1.95
Hadianto, D., Darmawan, H., & Suwarno, A. (2025). Analisis Produktivitas Tenaga Kerja dengan Metode Time and Motion Study pada Proses Packing CKD dengan Variasi Cycle Time. Jurnal Teknik Industri Terintegrasi, 8(3), 3304–3310. https://doi.org/10.31004/jutin.v8i3.48095
Hartini, S. (2022). Lean Manufacturing System.
Kamaruddin, K., Pupitasari, D., & Asmini, A. (2022). PENGARUH FAKTOR PRODUKSI TERHADAP PENINGKATAN PRODUKTIVITAS SEKTOR PERTANIAN (Studi Pada Masyarakat Petani di Kabupaten Sumbawa). Jurnal Ekonomi & Bisnis, 10(3), 379–389. https://doi.org/10.58406/jeb.v10i3.1049
Nuraina, N., Liecardo, C., Wijaya, F. J., Djoni, D., & Megawati, M. (2023). Analisis dan Perancangan Sistem Informasi Penjualan Furniture pada Toko Suci Furniture. Remik, 7(2), 1003–1015. https://doi.org/10.33395/remik.v7i2.12282
Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217
Purbasari, A., Sumarya, E., & Mardhiyah, R. (2023). Penerapan Metode Studi Waktu Dan Gerak Pada Proses Packing Di Pt. Abc. Sigma Teknika, 6(2), 290–299. https://doi.org/10.33373/sigmateknika.v6i2.5633
Robe, K., Realita, A. J., & Sholekah, A. (2024). Perilaku Produsen terhadap Peningkatan Jumlah Penjualan di Bisnis UMKM D ’ jamu Qu Desa Lubuk Makmur Kecamatan Lempuing Jaya Kabupaten OKI Provinsi Sumatera Selatan. 4, 9234–9241.
Sitanggang, N., & Luthan, P. L. A. (2019). Manajemen Kewirausahaan Furnitur. CV Budi Utama.
SUTRISNO, N., LESTARI, D. D., & SIRAIT, E. P. (2024). Pengaruh Pengadaan Bahan Baku Dan Proses Produksi Terhadap Kualitas Produk Pada Pt. Percetakan Gramedia Kab. Bekasi. CENDEKIA: Jurnal Ilmu Pengetahuan, 4(2), 191–202. https://doi.org/10.51878/cendekia.v4i2.2953
Tarwaka, Bakri, S. H. A., & Sudiajeng, L. (2004). Ergonomi Untuk Keselamatan, Kesehatan Kerja dan Produktivitas.
Wiranata, F. E., Simarmata, C. F. B., & Halim, L. (2023). Pengukuran waktu standar proses kerja mesin bandsaw dan cross cut untuk perencanaan dan evaluasi pemenuhan pesanan. Jurnal Teknik Industri Dan Manajemen Rekayasa, 1(1), 1–11. https://doi.org/10.24002/jtimr.v1i1.7034
Zadry, H. R., Susanti, L., Yuliandra, B., & Jumeno, D. (2015). Analisis Dan Perancangan Sistem Kerja. Andalas University Press.
Zainul, M. (2019). Manajemen Operasional. CV Budi Utama.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.