Penerapan Time And Motion Study dalam Upaya Perbaikan Waktu pada Proses Produksi CV. JM PUTRA

Authors

  • Andito Dwi Rangga Universitas Bina Bangsa
  • Urip Aji Trio Universitas Bina Bangsa
  • Alif Ranaya Syahadatan Gunawan Universitas Bina Bangsa
  • Budiharjo Budiharjo Universitas Bina Bangsa

DOI:

https://doi.org/10.61132/konstruksi.v3i4.1147

Keywords:

Work Efficiency, Standard Time, Time and Motion Study, Productivity, Furniture

Abstract

This study aims to analyze work time efficiency and determine standard time in the furniture production process at CV. JM Putra using the Time and Motion Study method. The background of this study stems from the problem of low production time efficiency due to suboptimal work methods, ineffective work area layout, and a lack of systematic work time measurement. The research was conducted quantitatively and descriptively through direct observation, interviews, and time measurements using a stopwatch for the table production process, which consisted of five main activities. The results showed that the average total cycle time for one table unit was 347.25 minutes, with the activity of assembling the table frame being the longest activity at 120.13 minutes or about 34.6% of the total working time. After performance assessment and the addition of a 15.5% allowance factor, the standard time was obtained at 129.03 minutes. These results indicate that the activity of assembling the table frame is the most critical point that affects production efficiency. The implications of this study show the importance of improving work methods, area layout, and operator training to increase labor productivity. The application of standard time measurement results can be used as a basis for setting work standards, production capacity planning, and a more objective labor incentive system.

References

Adila, A., & Hidayat Riyanto, W. (2021). Fungsi Produksi pada Pabrik Gula Krebet Baru Malang. Economie: Jurnal Ilmu Ekonomi, 3(1), 42. https://doi.org/10.30742/economie.v3i1.1569

Aditya Aprodicto Bestafirli, & Joumil Aidil Saifuddin. (2024). Improvement Productivity Menggunakan Metode Time And Motion Study Pada Area Line F PT KHI. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 2(1), 77–88. https://doi.org/10.61132/venus.v2i1.95

Hadianto, D., Darmawan, H., & Suwarno, A. (2025). Analisis Produktivitas Tenaga Kerja dengan Metode Time and Motion Study pada Proses Packing CKD dengan Variasi Cycle Time. Jurnal Teknik Industri Terintegrasi, 8(3), 3304–3310. https://doi.org/10.31004/jutin.v8i3.48095

Hartini, S. (2022). Lean Manufacturing System.

Kamaruddin, K., Pupitasari, D., & Asmini, A. (2022). PENGARUH FAKTOR PRODUKSI TERHADAP PENINGKATAN PRODUKTIVITAS SEKTOR PERTANIAN (Studi Pada Masyarakat Petani di Kabupaten Sumbawa). Jurnal Ekonomi & Bisnis, 10(3), 379–389. https://doi.org/10.58406/jeb.v10i3.1049

Nuraina, N., Liecardo, C., Wijaya, F. J., Djoni, D., & Megawati, M. (2023). Analisis dan Perancangan Sistem Informasi Penjualan Furniture pada Toko Suci Furniture. Remik, 7(2), 1003–1015. https://doi.org/10.33395/remik.v7i2.12282

Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217

Purbasari, A., Sumarya, E., & Mardhiyah, R. (2023). Penerapan Metode Studi Waktu Dan Gerak Pada Proses Packing Di Pt. Abc. Sigma Teknika, 6(2), 290–299. https://doi.org/10.33373/sigmateknika.v6i2.5633

Robe, K., Realita, A. J., & Sholekah, A. (2024). Perilaku Produsen terhadap Peningkatan Jumlah Penjualan di Bisnis UMKM D ’ jamu Qu Desa Lubuk Makmur Kecamatan Lempuing Jaya Kabupaten OKI Provinsi Sumatera Selatan. 4, 9234–9241.

Sitanggang, N., & Luthan, P. L. A. (2019). Manajemen Kewirausahaan Furnitur. CV Budi Utama.

SUTRISNO, N., LESTARI, D. D., & SIRAIT, E. P. (2024). Pengaruh Pengadaan Bahan Baku Dan Proses Produksi Terhadap Kualitas Produk Pada Pt. Percetakan Gramedia Kab. Bekasi. CENDEKIA: Jurnal Ilmu Pengetahuan, 4(2), 191–202. https://doi.org/10.51878/cendekia.v4i2.2953

Tarwaka, Bakri, S. H. A., & Sudiajeng, L. (2004). Ergonomi Untuk Keselamatan, Kesehatan Kerja dan Produktivitas.

Wiranata, F. E., Simarmata, C. F. B., & Halim, L. (2023). Pengukuran waktu standar proses kerja mesin bandsaw dan cross cut untuk perencanaan dan evaluasi pemenuhan pesanan. Jurnal Teknik Industri Dan Manajemen Rekayasa, 1(1), 1–11. https://doi.org/10.24002/jtimr.v1i1.7034

Zadry, H. R., Susanti, L., Yuliandra, B., & Jumeno, D. (2015). Analisis Dan Perancangan Sistem Kerja. Andalas University Press.

Zainul, M. (2019). Manajemen Operasional. CV Budi Utama.

Downloads

Published

2025-11-06

How to Cite

Andito Dwi Rangga, Urip Aji Trio, Alif Ranaya Syahadatan Gunawan, & Budiharjo Budiharjo. (2025). Penerapan Time And Motion Study dalam Upaya Perbaikan Waktu pada Proses Produksi CV. JM PUTRA. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 3(4), 199–209. https://doi.org/10.61132/konstruksi.v3i4.1147

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.