Perhitungan Waste Material Pekerjaan Penulangan, Pengecoran Serta Pemasangan Bekisting Pada Proyek Pembangunan Menara 17 PWNU Jawa Timur

Authors

  • Mohammad Arif Rahman Universitas 17 Agustus 1945 Surabaya
  • Ibni Aqiel Universitas 17 Agustus 1945 Surabaya
  • Dika Ayu Safitri Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.61132/konstruksi.v2i2.277

Keywords:

Waste Materials, Calculations, Development Project

Abstract

In the current era of globalization, students are not only required to learn theory, but are also required to study in the field. Therefore, students receive a Practical Work course with a weight of 2 credits which is carried out for a minimum of 2 months or the equivalent of 320 hours. This practical work aims to fulfill the requirements for passing the course and learn what you don't get in college. The Practical Work Project that we are carrying out is the East Java Nahdatul Ulama (PWNU) Regional Management Tower 17 Tower Construction project.

References

Abdul M., & Trijeti. (2013). Analisa Bekisting Metode Semi Sistem dan Metode Sistem Pada Bangunan Gedung. Jurnal: Universitas Muhammadiyah Jakarta. https://jurnal.umj.ac.id.

Devi, K. (2021). Analisis Dan Evaluasi Sisa Material Konstruksi Pada Proyek Pembangunan Gedung Kuliah 4 Lantai Universitas Muhammadiyah Riau. http://repository.uir.ac.id/id/eprint/11085%0Ahttps://repository.uir.ac.id/11085/1/153110856.pdf

Dwiretnani, A., Amalia, K. R., & A.K, A. W. (2020). Analisa Sisa Material Konstruksi Pada Kegiatan Pembangunan Mesjid. Jurnal Talenta Sipil, 3(2), 67. https://doi.org/10.33087/talentasipil.v3i2.31

Fransisko, T.J.T., & Revo. (2016). Metode Pelaksanaan Pekerjaan Balok dan Plat Lantai Dua Pada Pembangunan Mall Pelayanan Publik (MPP) Manado. Jurnal Sipil Statik Vol.8 N0.6 November 2020 (901-910). https://ejournal.unsrat.ac.id

Ibad, Husnil. (2016). Alternatif Pemasangan Bekisting Balok dan Plat pada Proyek Jember Icon dengan Metode Zonasi. Skripsi: Universitas Jember. https://repository.unej.ac.id.

Kristianto, M. A., Ajie, E. P., Hermawan, H., & Setiyadi, B. (2020). Analisis Waste Material Konstruksi Pada Pekerjaan Struktur Atas Beton Bertulang Bangunan Tingkat Tinggi. Jurnal Teknik Sipil, 15(3), 143–149. https://doi.org/10.24002/jts.v15i3.3727

Persada, R. M., & Sumarman. (2017). Analisis Perencanaan Struktur Hotel Dialog Grace Cirebon Menggunakan Struktur Beton SNI 2013. Jurnal Konstruksi, VI(5), 463–476.

Pertiwi, I. M., Herlambang, F. S., & Kristinayanti, W. S. (2019). Analisis Waste Material Konstruksi Pada Proyek Gedung (Studi Kasus Pada Proyek Gedung Di Kabupaten Badung). Jurnal Simetrik, 9(1), 185. https://doi.org/10.31959/js.v9i1.204

Pertiwi, I. M., Herlambang, F. S., & Kristinayanti, W. S. (2019). Analisis Waste Material Konstruksi Pada Proyek Gedung (Studi Kasus Pada Proyek Gedung Di Kabupaten Badung). Jurnal Simetrik, 9(1), 185. https://doi.org/10.31959/js.v9i1.204

Prakoso Nugroho, S. (2018). Analisis perbandingan biaya bekisting antara bekisting multiplek dan bekisting tegofilm untuk kolom gedung bertingkat. Universitas Islam Indonesia, 1–90.

Riyanto Angghi. (2018). Analisa Perhitungan Volume Besi Dan Beton Pada Struktur Kolom Gedung Tower 1 Proyek Meisterstadt Batam. Analisa Perhitungan Volume Besi Dan Beton Pada Struktur Kolom Gedung Tower 1 Proyek Meisterstadt Batam, 7–18.

Ruslan, U., Nuroji, N., & Windu P. (2011). Analisis Bekisting Terhadap Waktu Siklus Pengecoran Lantai Pada Gedung Bertingkat. http://shorturl.at/mpxBN

Saptari, A. S. (2020). Analisis Perbandingan Kinerja Bangunan Gedung Bertingkat Kolom Persegi Dengan Kolom Bulat Berdasarkan Metode Fema 356. ITENAS Library, 5–31. http://eprints.itenas.ac.id/1043/

Subagiyo, Sarjiyana, & Wirawan. (2017). Analisis kekuatan tarik besi beton ulir berdasarkan diameternya. Seminar Nasional Terapan Teknologi 2016 POLINEMA, November 2016, 97–101.

Zakaria, M. A., Yamali, F. R., & Dwiretnani, A. (2021). Evaluasi Penggunaan Material Bekisting Kayu Pada Proyek Pembangunan Gedung FKIP Universitas Jambi. Jurnal Talenta Sipil, 4(1), 6. https://doi.org/10.33087/talentasipil.v4i1.43

Published

2024-04-26

How to Cite

Mohammad Arif Rahman, Ibni Aqiel, & Dika Ayu Safitri. (2024). Perhitungan Waste Material Pekerjaan Penulangan, Pengecoran Serta Pemasangan Bekisting Pada Proyek Pembangunan Menara 17 PWNU Jawa Timur. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 2(2), 212–221. https://doi.org/10.61132/konstruksi.v2i2.277

Similar Articles

<< < 1 2 3 4 5 > >> 

You may also start an advanced similarity search for this article.