Analisis Perbandingan Produktivitas dan Value Engineering pada Pelaksanaan Pekerjaan Pemasangan Bata Merah dan Bata Ringan
(Studi Kasus : Proyek Perumahan Shopee Semanggi)
DOI:
https://doi.org/10.61132/konstruksi.v3i2.776Keywords:
Cost, Productivity, Value EngineeringAbstract
The selection of building materials is vital for the development of high-quality infrastructure and residential projects. The two most commonly used building materials are red bricks and lightweight bricks. This study compares the productivity and cost of red brick and lightweight brick production and installation in construction projects. Data were obtained through direct observation, worker interviews, and Value Engineering analysis on the Shopee Semanggi Housing Project, which consists of 136 houses with a total estimated budget (RAB) of Rp10.93 billion. The results show that red brick installation productivity is 3.3 m²/day, while lightweight brick installation reaches 17.9 m²/day. The installation cost for red bricks is Rp1.52 billion for 12,786.78 m², compared to Rp1.62 billion for lightweight bricks for the same area. This study provides guidance for selecting building materials based on time and cost efficiency.
References
Pritasari, Ni Komang Ayu Sinta and Yasa, I Made Tapa and Herlambang, Fajar Surya (2022) Analisis Per- bandingan Biaya Dan Produktivitas Pekerjaan Dinding Material Bata Ringan Dan Bata Merah Pada Proyek Pembangunan Gedung Direskrimsus Polda Bali. Diploma thesis, Politeknik Negeri Bali.
Dharil Inda Pratama 2020, Perbandingan Produktivitas Pekerjaan Pemasangan Dinding Bata Ringan dan Bata Merah, Pemambangunan Patra Conmfort Hotel dan Kost Hunian Eksklusif Yogyakarta.
Sely Novita Sari. 2019. Evaluasi Anggaran Biaya menggunakan Batu Bata Merah dan Batu Bata Ringan Gedung Kantor Kelurahan Bareng Kecamatan Klaten Tengah Kabupaten Klaten.
Kartohardjono, A, dkk. 2017. Analisis Value Engineering pada Proyek Pembangunan Apartement di Cikarang.
Jurnal Konstruksia, Vol.9(1)
Dharmayanti, G.A.P, Candra., Frederika, Ariany, S., Kumala, N. K. A., 2007. Rekayasa Nilai Proyek Villa Bukit Ubud, Jurnal Ilmiah Teknik Sipil Unud, Vol 11: 109-121
Dell'Isola, A. J. (1997). "Value Engineering in the Construction Industry." Journal of Management in Engineer- ing, 13(5), 56-67.
Kelly, J., & Male, S. (2001). "Value Management and Value Engineering." Journal of Construction Management and Economics, 19(1), 3-11
Dharmayanti, G.A.P, Candra., Frederika, Ariany, S., Kumala, N. K. A., 2007. Rekayasa Nilai Proyek Villa Bukit Ubud, Jurnal Ilmiah Teknik Sipil Unud, Vol 11: 109-121
Dharmayanti, G.A.P, Candra., Sudipta, I Gusti Ketut dan Saputra, Gede Tusan. . 2016. Analisis Perbandingan Biaya Dan Waktu Pekerjaan Dinding Menggunakan Bata Merah Dengan M – Panel
Kartohardjono, A, dkk. 2017. Analisis Value Engineering pada Proyek Pembangunan Apartement di Cikarang.
Jurnal Konstruksia, Vol.9(1)
Nurhermaya, Asterina., Meta Riany .2016. Penerapan Komponen Modular Sandwich Panel Pada Perancangan Rusunami Derwati Bandung. Jurnal Reka Karsa Jurnal Online Institut Teknologi Nasional.
Hutabarat, J., 1995, (Jurnal Sumiati., 2006). Penerapan Rekayasa Nilai Untuk Mendapatkan Nilai Tambah Pada Perusahaan Sandal Wanita, diaksesdari http://eprints.upnjatim.ac.id/124/1/210107-47-54.pdf.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.