Abstract

The main objective of arranging the warehouse layout is to find the most appropriate method so that the movement of goods in the warehouse runs smoothly. Apart from that, the aim of setting the warehouse layout is also to maximize the warehouse area so that the costs of handling activities remain low. Stacks of goods in the warehouse are stacked with a maximum height of 700 cm and above or approximately 7 items stacked in one pile. If these items continue to be stacked using 7 stacks and above, it can cause many defects to occur. This defect occurs because there are too many items piled up. The pile of items should be stacked with a maximum of 5 piles and above. Therefore, defects that occur can cause delays in delivery times and result in large costs experienced due to these defects

References

Azlia, W., & Carlinawati, N. (2017). Usulan perbaikan layout gudang soft part pada perusahaan perakitan speaker. Journal of Industrial Engineering Management, 2(2), 66. https://doi.org/10.33536/jiem.v2i2.168

Ekoanindiyo, F. A., & Wedana, Y. A. (2012). Perencanaan tata letak gudang menggunakan metode shared storage di pabrik plastik kota Semarang. Jurnal Ilmiah Dinamika Teknik, 6(1), 46–57.

Hartono, T. (2013). Bab II stack (tumpukan). 1–10. https://repository.unikom.ac.id/41983/1/pertemuan 2.pdf

Hernawati, Y., Mulyadi, N. P., Lestari, T. R., & Faidz, D. (2020). Evaluasi sistem pengendalian stock barang jadi di gudang PT. Indocare Citra Pasifik Group. E-Journal Equilibrum Manajemen, 6, 20–27.

Isnaeni, S., et al. (2021). Penerapan metode class based storage untuk perbaikan tata letak gudang barang jadi (Studi kasus gudang barang jadi K PT Hartono Istana Teknologi). Industrial Engineering Online Journal, 10(3).

Muthia, R. (2018). No 主観的健康感を中心とした在宅高齢者における 健康関連指標に関する共分散構造分析 Title. 2013, 1–26.

Riski, M., Yanuar, A., & Santosa, B. (2016). Gudang barang jadi PT XYZ dengan penerapan racking system untuk. Jurnal Rekayasa Sistem & Industri (JRSI), 3(4), 25–31.

Published

2024-07-09

How to Cite

Davin Herdiansyah Putra, Noval Sigit Nurdianto, Khoirul Yanuar Rizqi, & Putu Eka Karunia Dewi. (2024). Analisis Penataan Gudang dan Tumpukan Pada Gudang Barang Setengah Jadi PT.Integra Indocabinet.Tbk. Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri, 2(3), 01–08. https://doi.org/10.61132/manufaktur.v2i3.434

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.