Analisis Penjadwalan Proyek Pembangunan Jaringan Fiber Optik Menggunakan Metode Critical Path Methode (CPM) di Lemo - Lemo Bulukumba
DOI:
https://doi.org/10.61132/manufaktur.v2i3.510Keywords:
Critical Path Method, fiber optic network, project scheduling, cost efficiencyAbstract
This research aims to analyze the scheduling of the fiber optic network construction project in Lemo-Lemo, Bulukumba, using the Critical Path Method (CPM). This method was chosen to improve time and cost efficiency in project implementation. Research data were obtained through field observations, literature studies, and interviews with related parties. Analysis was carried out by mapping project activities, estimating duration, and calculating resource requirements and project costs. The results showed that the application of the CPM method was able to accelerate project completion from the initial estimate of 40 days to 21 days, with time savings of 19 days. In addition, the project cost which was initially estimated at Rp. 38,386,680 was successfully reduced to Rp. 37,000,000, resulting in a savings of Rp. 1,386,680. In conclusion, the CPM method proved to be effective in improving time and cost efficiency in fiber optic network construction projects. Therefore, it is recommended that this method be applied consistently in similar projects in the future.
References
Alfandi MA, Divya AA. 2020. Manajemen Proyek Pembangunan Jaringan Fiber Optik. Penerbit Fakultas Teknik Telekomunikasi Politeknik Negri Ujung Pandang. Makassar.
Astutik, F. (2016). Artikel Skripsi Universitas Nusantara PGRI Kediri ANALISIS PENERAPAN METODE. In Ekonomi Akuntansi (Vol. 01, Issue 08).
Awaluddin. 2017. Optimasi Penjadwalan Proyek Pembangunan Jalan Dengan Metode PERT Dan CPM. Penerbit Departemen Mataematika, Fakultas Matematika Dan Ilmu Pengetahuan Alam, Universitas Sumatra Utara. Sumatera Utara.
Brando, R., Walangitan, P. D. R. O., & Tjakra, J. (2017). SISTEM PENGENDALIAN WAKTU DENGAN CRITICAL PATH METHOD (CPM) PADA PROYEK KONSTRUKSI (Studi Kasus : Menara Alfa Omega Tomohon). Jurnal Sipil Statik, 5(6), 363–371.
Dwiretnani, A., & Kurnia, A. (2014). Optimalisasi Pelaksanaan Proyek Dengan Metode Evaluasi Dan Review Proyek (Pert) Dan Critical Path Method (Cpm). Pert Dan Cpm, 3(Juli-Desember 2015), 7.
Fitrah M, Luthfiyah. 2017. Metodologi Penelitian. Penerbit CV Jejak, Sukabumi.
Hamdan DA, Kadar N. 2014. Manajemen Proyek. Penerbit Pustaja setia, Bandung.
Heizer J, Render B. 2014. Operation Management. Penerbit Salemba Empat, Jakarta.
Koolma A, Schoot CJMVD. 2007. Manajemen Proyek. Penerbit UI PRESS, Jakarta.
Manser M. 2014. Manajemen Proyek Yang Sukses. Penerbit PT Indeks, Jakarta.
Olateju. 2011. Manajement Practice. Penerbit Departemen of Business Administration and Management Technology Lagos State University. Nigeria.
Sahid. 2017. Mengimplementasikan Metode CPM Pada Proyek Global Technology for Local Community. Penerbit Fakultas Teknik Industri, Universitas Islam Indonesia. Jogja.
Weka A. 2015. Perencanaan jaringan Fiber to The Home (FTTH) di Taman Kopo Bandung 3 Bandung (Design of FTTH Network In Taman Kopo Indah 3 Bandung). Penerbit Teknik Mesin, Fakultas Teknik Mesin, Institut Teknologi Bandung. Bandung.
Wohon, F. Y. (2015). Analisa Pengaruh Percepatan Durasi Pada Biaya Proyek Menggunakan Program Microsoft Project 2013 (Studi Kasus : Pembangunan Gereja GMIM Syaloom Karombasan). Jurnal Teknik Sipil, 3 (2) (2337– 6732), 141–150.
Wowor, F. N., Sompie, B. F., Walangitan, D. R. O., Malingkas, G. Y., Teknik, F., Teknik, J., Universitas, S., Ratulangi, S., Masalah, P., & Masalah, B. (2013). Aplikasi Microsoft Project Dalam Pengendalian. Jurnal Teknik Sipil, 1(8), 543–548.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.