Perencanaan Penggantian dan Perbaikan Komponen Penggiling Kopi Kapasitas 2 kg/Jam Periode 2026
DOI:
https://doi.org/10.61132/venus.v3i6.1256Keywords:
Capacity 2 kg/Hour, Coffee Grinder, Component Replacement, Maintenance and Repair, Replacement Period 2026Abstract
Unexpected downtime of a 2 kg/hour coffee grinder is crucial in cafe operations, thus less guaranteeing the availability of the grinder. The purpose of component replacement and repair planning is to obtain a prediction of the maintenance and repair schedule and costs in the 2026 period. The component replacement planning method includes collecting previous maintenance and repair data, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, predicting component life, predicting technician costs, predicting supporting work equipment and supporting materials to be used in maintenance, predicting the time to replace spare parts or reinstall components after repair, estimating maintenance and repair costs for the 2026 period, and calculating the ratio of maintenance costs to profits. The results of component replacement and repair planning obtained maintenance costs for the 2026 period are IDR 2,350,000, - with an estimated coffee grinder rental rate of IDR 25,000/hour which has the potential to be rented for 1440 hours/year, and the ratio of maintenance costs to profits is 6.5% which implies that the coffee grinder with a capacity of 2 kg / hour is still suitable for use for the next few years and still has the opportunity to make a profit.
References
Balappa, B. U., Dayananda, B. S., Dinesh, P. A., & Suresh, R. (2024). Thresher-Dehusker Farm Machinery: Review of current situation and future needs in Indian context and development of prototype unit. Agriculture and Natural Resources, 58(2), 267-274. https://doi.org/10.34044/j.anres.2024.58.2.11
Bintang, M., Pratama, R., & Puspitasari, E. (2024). Analysis of Extrusion Blow Molding Machine Maintenance Planning with Reliability Centered Maintenance and IRRO Method. Jurnal Sistem Teknik Industri, 26(2), 258-268. https://doi.org/10.32734/jsti.v26i2.16895
Fede, G., Bousdekis, A., Magoutas, B., & Mentzas, G. (2024). Integrating production and maintenance planning in process industries using Digital Twin: A literature review. IFAC-PapersOnLine, 58(19), 151-156. https://doi.org/10.1016/j.ifacol.2024.09.124
Hadi, S., Azis, A.A., Vuyus, V., Puspitasari, E., Firdaus, A.H. & Setiawan, A. (2021). Planning for Maintenance and Repair of Continuous Ship Unloader Using the IRRO. Journal of Engineering Design and Technology, 21(1), 52-63. https://doi.org/10.31940/logic.v21i1.2383
Hariono, B. & Prabawati, A. D. (2024). Minimasi Biaya Perawatan Mesin Vis Pulper Pengupasan Biji Kopi dengan Menggunakan Metode Preventive Maintenance di PTPN XII Ngrangkah Pawon. Jurnal Teknik Terapan, 2(2). https://doi.org/10.25047/jteta.v2i2.30
Hariono, M.Si, Dr. Ir. B., & Irnain, U. (2023). Analisis Repair Maintenance dan Preventive Maintenance pada Mesin Huller di Industri Kopi. Jurnal Ilmiah Inovasi, 23(3), 251-258. https://doi.org/10.25047/jii.v23i3.3988
Hosseini, S. M. S., Shahanaghi, K., & Shasfand, S. (2024). Functional Model of Integrated Maintenance (Reliability, Overall Equipment Effectiveness, Safety, and Cost) in Petrochemical Industries. International Journal of Engineering, Transactions B: Applications, 37(11), 2392-2404. https://doi.org/10.5829/IJE.2024.37.11B.23
Mauluddin, Y., Rahmawati, D., & Oktavianti, D. (2022). Perencanaan Pemeliharaan Mesin Produksi dengan Menggunakan Total Productive Maintenance untuk Menjamin Kestabilan Proses Produksi. 20(2), 86-92. https://doi.org/10.35873/jkalibrasi.v20i2.1423
Purnamasari, A., Putra, F. E. & Astuti, R. F. (2025). Analisis Efektivitas Program Preventive Maintenance Menggunakan Metode Total Productive Maintenance (TPM) di PT Sinar Sosro Cibitung. JUTIN: Jurnal Teknik Industri Terintegrasi, 8(4). https://doi.org/10.31004/jutin.v8i4.52029
Rosmalia, A., Wibowo, P. A. & Ulum, R. B. (2025). Analisis Efektivitas Perawatan Preventif Menggunakan OEE dan Six Big Losses Pada Mesin Simplex di PT. XYZ. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro Dan Informatika, 3(4), 295-309. https://doi.org/10.61132/jupiter.v3i4.991
Salehpour, I. B., & Shahrokhi, M. (2025). Computational Optimization of Preventive Maintenance Schedules in Repairable Mechanical Systems Using NSGA-II. Journal of Computational Applied Mechanics, 56(4), 882-911. https://doi.org/10.22059/jcamech.2025.398973.1554
Siahaan, S. H., Purba, J. S., & Simanjuntak, M. G. (2024). Kajian Rencana Pembuatan Mesin Penggiling Kopi. Jurnal Pendidikan Teknik Mesin Undiksha, 12(2), 73-82. https://doi.org/10.23887/jptm.v12i2.83314
Siregar, C.A., Siregar, A.M., Lubis, R.W. & Marpaung, D. (2022). Rancang Bangun Mesin Giling Kopi untuk Menunjang dan Membuka Unit Usaha Baru Mitra Deli Coffe. Abdi Sabha, Jurnal Pengabdian kepada Masyarakat, 174-180. https://doi.org/10.53695/jas.v3i2.657
Tuomi, A., Tussyadiah, I. P., & Stienmetz, J. (2021). Applications and Implications of Service Robots in Hospitality. Cornell Hospitality Quarterly, 62(2), 232-247. https://doi.org/10.1177/1938965520923961
Warandi, R. R. A., Furqon, M., Gandara, D., Yudhi, T., Rosadi, A., Santoso, S., Setyawan, A. B., Noor, S., Samsu, S., & Rahayuningtyas, A. (2024). Development of Flat Burr Coffee Grinding Machine for Small and Medium Enterprises Scale. Journal of Applied Agricultural Science and Technology, 8(4), 480-491. https://doi.org/10.55043/jaast.v8i4.290
Zamri, A., Mandora, R.J. & Yuliarman. (2023). Perancangan Mesin Penggiling Kopi Dan Penakar Bubuk Kopi Untuk Usaha Mikro Kecil Menengah. Jurnal Rekayasa Material, Manufaktur Dan Energi, 6(2), 267-279. https://doi.org/10.30596/rmme.v6i2.16316
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Venus: Jurnal Publikasi Rumpun Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.