Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method
DOI:
https://doi.org/10.61132/venus.v3i6.1232Keywords:
90 M/H Capacity, Maintenance Cost To Profit Ratio, Rubber Wheel Mount, Universal/Cross Joint, Wood Profile Making MachineAbstract
The problems encountered are damage to the rubber wheel mount and universal/cross joints on the 90 m/hour capacity wood profile making machine, which can affect the uniformity and speed of wood profile making. Maintenance and repair planning aims to be able to create a maintenance and repair schedule for the 90 m/hour capacity wood profile making machine for the period 2026, estimate maintenance costs and the ratio of maintenance and repair costs to machine profits. The maintenance planning method includes collecting maintenance data from previous maintenance periods, reviewing the specifications of the wood profile making machine, estimating the age and price of components that are estimated to be damaged, estimating the cost and duration of dismantling and installing components that have been repaired in accordance with the provisions of the requirements for usable components or replacement spare parts, scheduling maintenance and repairs, estimating maintenance and repair costs for the period 2026, and determining the ratio of maintenance costs to profits. The planning results in the form of a maintenance-repair schedule for the period 2026; maintenance and repair costs in 2026, the ratio of maintenance costs to profits, and their implications indicate that the machine is still prospective and usable.
References
Achouch, M., Boulkaibet, I., & Gherfi, A. (2022). Prognostics-enhanced maintenance. Applied Sciences, 12(21), 1-20.
Al-Douri, P. (2019). Unplanned downtime impact in manufacturing. Maintenance Engineering Journal, 34(2), 77-85.
Anonymous. (2018). SIST EN ISO 19085-1:2017/AC:2018 - Safety of woodworking machines, Part 1: Common requirements. ISO.
Anonymous. (2023). MP200 2-sided planer/moulder (Product information page). WoodMizer.
Einabadi, M., Shafiee, M., & Sørensen, J. D. (2023). Reliability-based maintenance optimization. Reliability Engineering & System Safety, 230, 109014.
Einabadi, N., & Mahdavi, S. (2023). Multi-objective maintenance models. International Journal of Industrial Engineering, 30(4), 248-260.
Firdaus, M. (2023). IoT-enabled maintenance decision support. Journal of Engineering and Technology, 7(3), 144-154.
Hadi, S. (2019). Maintenance and repair for industrial machinery. Andi Publisher.
Hadi, S., Al Azis, A., Viyus, V., Puspitasari, E., Firdaus, A. H., & Setiawan, A. (2021). Planning for maintenance and repair of continuous ship unloader using the IRRO method. Journal of Engineering and Technological Sciences, 21(1), 52-63. https://doi.org/10.31940/logic.v21i1.2383
Lemes, A., & Hvam, L. (2019). Calendar vs. condition-based maintenance strategy comparison. Procedia CIRP, 81, 955-960.
Pratama, R., & Puspitasari, E. (2024). IRRO-based maintenance planning for industrial equipment. Journal of Maintenance Management, 3(1), 45-56.
Setiawannie, H., & Marikena, S. (2022). Energy-aware maintenance optimization. Journal of Industrial Engineering, 5(2), 11-20.
Sutrisno, P., & Priyono, A. (2024). Availability-based maintenance planning. Industrial Engineering Letters, 14(1), 23-32.
Tai, J. L.; Sultan, M. T. H.; Łukaszewicz, A.; Shahar, F. S.; Oksiuta, Z.; Krishnamoorthy, R. R. (2024). Enhancing turnaround maintenance in process plants: A review. Applied Sciences, 14(15). https://doi.org/10.3390/app14156707
Werbińska-Wojciechowska, D. (2023). Maintenance 4.0 challenges. IFAC-PapersOnLine, 56, 351-358.
Yang, J. (2022). Preventive maintenance scheduling for production assets. International Journal of Production Economics, 250, 108520.
Yunusa-Kaltungo, A., & Ahmad, M. W. (2024). Assessment of safety climate perception of maintenance and turnaround activities in hydrocarbon processing facilities. Quality and Reliability Engineering International.
Zhang, S. (2021). Spare parts inventory management: A literature review. Sustainability, 13(5), 2460. https://doi.org/10.3390/su13052460
Zheng, J., Ren, J., Pei, H., Zhang, J., & Zhang, Z. (2024). Lifetime prediction and replacement optimization for a standby system considering storage failures of spare parts. Reliability Engineering & System Safety, 250, 110195. https://doi.org/10.1016/j.ress.2024.110195
Zhu, Q., Chen, X., Li, Y., & Wang, S. (2019). Predictive maintenance for rotating machinery. Journal of Manufacturing Systems, 51, 152-163.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Venus: Jurnal Publikasi Rumpun Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.