Studi Kelayakan Pembangkit Listrik Tenaga Surya Untuk Penerangan di Lokasi Ekowisata Mangrove Lembung, Desa Lembung, Kecamatan Galis, Kabupaten Pamekasan

Authors

  • Muhammad Kharisma Ayyubi Politeknik Negeri Malang
  • Ach Muhib Zainuri Politeknik Negeri Malang
  • Fauzan Baananto Politeknik Negeri Malang
  • Nurlia Pramita Sari Politeknik Negeri Malang
  • Wirawan Wirawan Politeknik Negeri Malang

DOI:

https://doi.org/10.61132/venus.v2i5.600

Keywords:

Feasibility study, Off-grid system, Solar power plant

Abstract

Solar Power Plant is a photovoltaic system to convert electromagnetic energy from sunlight into electrical energy. This solar power plant is one of the recommended solutions for fulfilling electricity needs in remote rural areas where the PLN electricity network does not enter and has abundant sunlight and fuel is difficult to obtain. Based on data from the Global Solar Atlas, Lembung Mangrove Ecotourism, Galis, Pamekasan Regency has a sunlight potential of 4,603 kWh/m² per day. Therefore, it is unfortunate if this potential is not optimally utilised to build an off-grid solar power plant. The purpose of the research is to assess the feasibility of installing PLTS in Lembung Mangrove Ecotourism in terms of technical, economic, and investment feasibility analysis. From the research results, to meet the electricity demand of 15,055 kWh, it needs 12 200 Wp PV modules assembled in 6 series 2 parallel, 8 12V 200Ah batteries with 4 series 2 parallel, and 1 3 kW hybrid inverter are needed. From the simulation results, the estimated energy that can be produced is 35 kWh with a performance of the system is 61.42%. In terms of investment, the initial capital required is Rp89,954,000 so that the NPV value is obtained at Rp1,725,979, PI is 1.01, and PBP is estimated to fall in year 22 month 11.

References

Advance Renewable Energy Systems. (2014).

Asrori, A., Ramdhani, A. F., Nugroho, P. W., & Eryk, I. H. (2022). Kajian kelayakan solar rooftop on-grid untuk kebutuhan listrik bengkel mesin di Polinema. ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektronika, 10(4).

Concentrating Solar Power Technology (Second Edition). (2021).

Firaldi, F. R., Wibowo, R. S., & Anam, S. (2023). Studi kelayakan teknis dan ekonomi pemasangan PLTS atap on-grid pada sistem kelistrikan gedung perpustakaan ITS. Jurnal Teknik ITS, 12(1).

Firmanda Al Riza, D., Ihtsham Ul Haq Gilani, S., & Ihtsham-ul Haq Gilani, S. (2014). Standalone photovoltaic system sizing using peak sun hour method and evaluation by TRNSYS simulation. International Journal of Renewable Energy Research, 4(1).

Hajir, N., Haddin, M., & Suprajitno, A. (n.d.). Analisa perencanaan pembangkit listrik tenaga surya atap dengan sistem hybrid di PT. Koloni Timur.

Instalasi Pembangkit Listrik Tenaga Surya: Dos & Don’ts. (n.d.).

Kodir Al Bahar, A., & Teguh Maulana, A. (2018). Perencanaan dan simulasi sistem PLTS off-grid untuk penerangan gedung fakultas teknik UNKRIS. Jurnal Ilmiah Elektrokrisna, 6(3).

Kusumaning Tiyas, P., & Widyartono, M. (n.d.). Pengaruh efek suhu terhadap kinerja panel surya.

Megantoro, P., Syahbani, M. A., Sukmawan, I. H., Perkasa, S. D., & Vigneshwaran, P. (2022). Effect of peak sun hour on energy productivity of solar photovoltaic power system. Bulletin of Electrical Engineering and Informatics, 11(5).

Nabella, S. D., Kunci, K., Laporan, A., Kas, A., Laporan, A., Kinerja, D., & Perusahaan, K. (2021). Analisa laporan arus kas sebagai alat untuk menilai kinerja keuangan perusahaan PT Kimia Farma Tbk. Jurnal Bening, 8(2). Universitas Riau Kepulauan.

Soedjarwanto, N., Komalasari, E., & Fardhan, S. A. (n.d.). Studi kelayakan pembangkit listrik tenaga surya (PLTS) dengan baterai dan terhubung grid di Nias, Sumatera Utara.

Syahwila, M., & Kadir, N. (2021). Rancang bangun modul pembangkit listrik tenaga surya (PLTS) sistem off-grid sebagai alat penunjang praktikum di laboratorium. Jurnal Pengolahan Laboratorium Pendidikan, 3(1).

Udianto, P., & Yudiyanto, E. (n.d.). Studi kelayakan pembangkit listrik tenaga surya untuk penerangan di lokasi wisata Pantai Gemah Tulungagung, Jawa Timur, 21(2).

Yulianto, A. M., Wahyurini, E. T., & Hidayat, M. T. (2022). Seminar nasional sumber daya lokal (SEMNASDAL III) "Digitalisasi produk lokal pertanian dalam mendukung ketahanan pengembangan ekowisata mangrove Lembung dalam penguatan sosial ekonomi masyarakat di Desa Lembung

Published

2024-10-25

How to Cite

Muhammad Kharisma Ayyubi, Ach Muhib Zainuri, Fauzan Baananto, Nurlia Pramita Sari, & Wirawan Wirawan. (2024). Studi Kelayakan Pembangkit Listrik Tenaga Surya Untuk Penerangan di Lokasi Ekowisata Mangrove Lembung, Desa Lembung, Kecamatan Galis, Kabupaten Pamekasan. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 2(5), 205–222. https://doi.org/10.61132/venus.v2i5.600

Similar Articles

<< < 5 6 7 8 9 10 

You may also start an advanced similarity search for this article.