Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

Authors

  • Johan Hidayat Universitas Sultan Ageng Tirttayasa
  • Muhammad Fatkhurrokhman Universitas Sultan Ageng Tirttayasa

DOI:

https://doi.org/10.61132/venus.v2i6.635

Keywords:

20 kV cubicle, periodic maintenance, electrical distribution

Abstract

Maintenance of 20 kV cubicles at PT. Haleyora Powerindo is a crucial step in ensuring the reliability and safety of the electrical distribution system. This process includes preparation stages such as inspecting work equipment, coordinating power outages, and utilizing safety equipment (PPE) to minimize the risk of accidents. Subsequent steps involve voltage disconnection, verifying zero voltage using detection tools, cleaning components with specialized fluids, and drying to ensure that moisture does not cause disruptions. Once all stages are completed, the voltage is carefully reactivated, and a maintenance report is prepared to document the process. This study employs direct observation, interviews, and document analysis to evaluate the maintenance implementation and provide recommendations for quality improvement. The results are expected to serve as a guide for other companies in enhancing the efficiency and reliability of 20 kV cubicle maintenance to ensure a stable electricity supply.

 

 

References

Adirawati, F. A. P., & Samsurizal, S. (2023, November). Pengaruh Partial Discharge Pada Kubikel Incoming 20 kV dengan Metode TEV. In Seminar Nasional Teknik Elektro.

Berlianti. R., Fauzi. R., & ,Monice. (2021). Analisis Penerapan Tindakan Pemeliharaan Sistem Distribusi 20 kV Dalam Pengoptimalan ENS dan FGTM. SainETIn Vol. 5 No.

Effendi, B. A. (2020). Pengujian Tahanan Isolasi Pada Pemeliharaan Pemutus Tenaga (Pmt) Kubikel Outgoing 20 Kv Menggunakan Insulation Tester Di Gardu Induk Bantul PT. PLN (Persero) UP2D JTY DCC 2 Yogyakarta. Jurnal Kajian Teknik Elektro, 5(2),

Firmansyah. M. A., & Rahmadewi. R. (2023). Sistem Pemeliharan Tanpa Padam Dengan Menggunakan Unit Gardu Bergerak (Ugb) Di Unit Pelaksana Pelayanan Pelanggan Kramat Jati. Jurnal Ilmiah Wahana Pendidikan, 9(12), 326-334

Hamid, M. A., Balol, W. A., & Anisa, N. (2022). Analisis Persediaan Material dengan Metode MRP pada Pemeliharaan Kubikel 20 KV. Jurnal Penelitian & Pengkajian Ilmiah Mahasiswa (JPPIM), 3(3), 59-72.

Hasyim. A, & Rizal. M. (2019). ANALISIS PENGGUNAAN CUBICLE 20KV DOUBLE INCOMING DENGAN AUTOMATIC TRANSFER SWITCH (ATS) DALAM SISTEM JARINGAN DISTRIBUSI 20KV DI BANDARA INTERNASIONAL SULTAN HASANUDDIN. Universitas Muhammadiyah Makasar.ac.id

Kartika. M, & Bangsa. I. A. (2022). PEMELIHARAAN PREVENTIF KUBIKEL CBOG 20 KV DI PT PLN (PERSERO) UP3 BEKASI UID JAWA BARAT. JE-UNISLA. Volume 7 No.2

Karunia, I., Sunaya, I. N., & Narottama, A. A. N. M. (2022). Pengoperasian Kubikel Merk Schneider Electric SM6 Type DM1~ A Gardu Distribusi DB 0616 Penyulang Rsup PT PLN (Persero) UP3 Bali Selatan (Doctoral dissertation, Politeknik Negeri Bali).

Kusumo, B. (2023). ANALISIS TERJADINYA GAGAL TRIP PENYULANG KACA PIRING PADA SISTEM KUBIKEL 20 KV GARDU INDUK KEBON JERUK. Jurnal Cahaya Mandalika ISSN 2721-4796 (online), 3(2), 1944-1962.

Lestari, N., Suwanto, H., & Gunawan, R. (2020). Sistem Pemantauan Kubikel Tegangan Menengah Berbasis Internet of Things. Infotronik: Jurnal Teknologi Informasi dan Elektronika, 5(1), 37-42.

Prasetiyo, W. A., & Winarno, H. (2013). simulator kubikel minimum untuk investigasi gangguan scada sistem distribusi tenaga listrik 20 KV. Gema Teknologi, 17(4).

Primanto, M. D., & Sasmoko, P. (2014). Dummy Cb sebagai Alat Simulator Kubikel untuk Pemeliharaan Preventif dan Korektif Guna Mengurangi Frekuensi Padam Penyulang 20 Kv (Aplikasi pada Sistem Scada 20 Kv Pt. pln (Persero) Apd Jateng & DIY). Gema Teknologi, 18(1), 21-26.

Putra, R. V. (2017). Prototipe Sistem Pengoperasian Gardu Portal Konvensional 20kv Dalam Kondisi Pemeliharaan (Doctoral dissertation, Institut teknologi Sepuluh Nopember).

Rahel, G. Y. (2022). PENGOPERASIAN PEMASANGAN KUBIKEL BARU PADA GARDU HUBUNG GH158. repository.pnj.ac.id.

Rahmadani, E. T. R., Wildan, M., & Azka, M. (2024). The Analisis Perbaikan Peralatan Pada Sistem Server Atis Pylot Berupa Broadcast Data Cuaca Yang Tidak Diterima Oleh Pesawat. JURNAL AMPLIFIER: JURNAL ILMIAH BIDANG TEKNIK ELEKTRO DAN KOMPUTER, 14(1), 56-60.

Saputra. I. G. D., Sofwan. A., & Isnanto. R. R. (2024). Desain Proteksi Kubikel 20 kV pada Gardu Distribusi Pelanggan Tegangan Menengah di PT PLN (Persero) Unit Pelaksana Pelayanan Pelanggan (UP3) Bali Utara. JPII Vol 2 (4) 232-237

Sriyadi, S., Pangestu, A., Wilyanti, S., Al Hakim, R. R., & Vresdian, D. J. (2021). Prototipe Alat Pendeteksi Korona Sebagai Proteksi Kubikel Keluaran 20 KV Pelanggan Tegangan Menengah. Jurnal Sosial Teknologi, 1(5), 366-375.

Sukoco, Y., Izzati, N., & Wardana, HK (2023). Pengukuran Resistansi Isolasi Terminal Gardu Induk Kubikel 20KV Masuk PT Haleyora Power Region 3 Area Jawa Timur Mojokerto. Elconika: Jurnal Teknik Elektro , 1 (2), 32-41.

Takwa , Antarissubhi , Adriani. (2024). ANALISIS KUBIKEL 20 KV DI WILAYAH KERJA PT PLN (PERSERO) UP3 MAKASSAR SELATAN. Jurnal Multidisiplin Saintek Volume 2, No. 7 2024.

Tuasuun. M. F., & Akhiriyanto. N. (2024). Perawatan Tahunan Panel Distribusi TM P50 Pada Sistem Jaringan Listrik PT.X. Jurnal Sistem Kelistrikan Vol. 11 No. 1.

WIDIARTO, H., & Suprihartini, Y. (2022). Analisis Kualitas Jalur Distribusi Menggunakan Etap Power Station 12.6. 0 Pada Gardu Politeknik Penerbangan Indonesia.CENDEKIA: Jurnal Ilmu Pengetahuan, 2(1), 82-90.

Downloads

Published

2024-12-04

How to Cite

Johan Hidayat, & Muhammad Fatkhurrokhman. (2024). Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 2(6), 130–149. https://doi.org/10.61132/venus.v2i6.635

Similar Articles

<< < 1 2 3 > >> 

You may also start an advanced similarity search for this article.