Perancangan Ulang Tata Letak Fasilitas Produksi Beton menggunakan Metode Activity Relationship Chart (ARC) di PT. XYZ
DOI:
https://doi.org/10.61132/venus.v3i3.949Keywords:
ARC, ARD, Facility Layout, Material Handling, TCRAbstract
Material handling is a term for transportation or transport activities carried out by industrial companies, which involve moving raw materials, semi-finished goods or finished goods from one location to another predetermined location. Apart from that, material handling is also important in quality control, where 3-5% of damaged goods are caused by material handling. The aim of this research is to identify and redesign the layout conditions of concrete production facilities at PT. XYZ. The method of this research is the Activity Relationship Chart (ARC), Activity Relationship Daigram (ARD) and Total Closeness Rating (TCR) methods. In the current layout conditions, the sand warehouse and crushed stone warehouse work stations should be close to the two hoppers, namely the batching plant hopper and the asphalt mixing plant hopper, but in the actual conditions these two work stations are not close to each other. In the new facility layout there are changes and relocation of work stations based on the degree of proximity. Future research is expected to consider the amount of time generated during the material handling process and also consider cost aspects during the process of designing changes to the facility layout.
References
Alamsyah, A. D., & Suhartini. (2021). Usulan rancangan tata letak fasilitas proses replating kapal dengan menggunakan metode ARC dan ARD (studi kasus di SBU Galangan Pelni Surya). Senastitan I, 1, 65–71.
Albert, A., Yulianto, D., Setiawan, D., & Wijayanto, E. (2023). Perancangan ulang tata letak fasilitas menggunakan metode ARC di Tarzan Photo. (Nama jurnal atau prosiding tidak tersedia), 201–209.
Bisri, et al. (2022). Perancangan ulang tata letak fasilitas produksi menggunakan metode systematic layout planning dan Blocplan. Procedia of Engineering and Life Science, 3, 1–10.
Casban, C., & Nelfiyanti, N. (2020). Analisis tata letak fasilitas produksi dengan metode FTC dan ARC untuk mengurangi biaya material handling. Jurnal PASTI, 13(3), 262. https://doi.org/10.22441/pasti.2019.v13i3.004
Gunawan, W., & Haerulloh, H. (2021). Usulan tata letak fasilitas Kampus 1 Universitas Banten Jaya dengan menggunakan metode ARC dan ARD. Jurnal InTent, 4(2). (Halaman tidak dicantumkan)
Halimsyah, Y., Syara, R., & Wilujeng, H. (2023). Evaluasi layout fasilitas produksi minyak kelapa sawit di PT. ABC dengan metode activity relationship chart (ARC) dan activity relationship diagram. Journal of Green Engineering for Sustainability, 01, 13–24.
Jamalludin, Fauzi, A., & Ramadhan, H. (2020). Metode activity relationship chart (ARC) untuk analisis perancangan tata letak fasilitas pada Bengkel Nusantara Depok. Bulletin of Applied Industrial Engineering Theory, 2(1), 20–22.
Laksono, B. (2022). Perancangan tata letak fasilitas pada UKM pembuatan arko guna meningkatkan kapasitas produksi. Integrasi Jurnal Ilmiah Teknik Industri, 7(2), 53.
Muharni, Y. (2022). Perancangan tata letak fasilitas gudang Hot Strip Mill menggunakan metode activity relationship chart dan Blocplan. Jurnal Teknik Industri, *(7)*2. https://doi.org/10.24014/jti.v7i2.11526
Rokhmani, E. W., Desiyanto, F., & Harsadi, I. (2021). Perencanaan tata letak fasilitas mesin produksi menggunakan metode activity relationship chart (ARC) di CV. Yasri Cipta Mandiri. Unistek, 8(2), 107–112. https://doi.org/10.33592/unistek.v8i2.1503
Sari, C. D., & Rahayu, Y. (2020). Pengaruh likuiditas, leverage, ukuran perusahaan dan komisaris independen terhadap agresivitas pajak. Jurnal Ilmu dan Riset Akuntansi, 9(2), 1–19.
Septiani, T., & Syaichu, A. (2020). Perencanaan ulang tata letak fasilitas menggunakan metode activity relationship chart (ARC). SISTEM: Jurnal Ilmu-Ilmu Teknik, 16(2), 34–45. https://doi.org/10.37303/sistem.v16i2.184
Simanjuntak, R. A., & Mawadati, A. (2021). Usulan perbaikan tata letak fasilitas produksi di PT. XYZ. Jurnal Nasional Aplikasi Sains & Teknologi, 1(1), 93–100. https://journal.akprind.ac.id/index.php/snast/article/view/3425
Soeltanong, M. B., & Sasongko, C. (2021). Perencanaan produksi dan pengendalian persediaan pada perusahaan manufaktur. Jurnal Riset Akuntansi & Perpajakan (JRAP), 8(1), 14–27. https://doi.org/10.35838/jrap.2021.008.01.02
Sudarso, A. (2022). Pemanfaatan basis data, perangkat lunak dan mesin industri dalam meningkatkan produksi perusahaan (literature review executive support system (ESS) for business). Jurnal Manajemen Pendidikan dan Ilmu Sosial, 3(1), 1–14. https://doi.org/10.38035/jmpis.v3i1.838
Suminar, L. A., Wahyudin, W., & Nugraha, B. (2020). Analisis perancangan tata letak pabrik PT. XYZ dengan metode activity relationship chart (ARC). Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri, 20(2), 181. https://doi.org/10.36275/stsp.v20i2.276
Syaichu, A., & Nurhuda, W. (2021). Perencanaan ulang stasiun kerja untuk meminimalkan biaya material handling menggunakan metode ARC (activity relationship chart) dan FTC (from-to chart) di CV Karsa Galih Kusuma. SISTEM: Jurnal Ilmu-Ilmu Teknik, 17(3), 9–19. https://doi.org/10.37303/sistem.v17i3.215
Tiyatna, A., Setiawan, A., Shafna, S., Mawardi, S. L., Husyairi, K. A., & Ainun, T. N. (2023). Perancangan ulang tata letak minimarket Sumber Rezeki dengan pendekatan activity relationship chart (ARC) dan total closeness rating (TCR). Journal of Industrial Engineering and Operation Management, 6(1), 146–154. https://doi.org/10.31602/jieom.v6i1.11390
Yulistio, A., Basuki, M., & Azhari, A. (2022). Perancangan ulang tata letak display retail fashion menggunakan activity relationship chart (ARC). Jurnal Ilmiah Teknik Industri, 10(1), 21–30. https://doi.org/10.24912/jitiuntar.v10i1.9388
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Venus: Jurnal Publikasi Rumpun Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



