Manajemen Risiko terhadap Nilai Klaim Asuransi Rangka Kapal Berdasarkan ITC (Institute Time Clause) Hull 1.10.83 Clause 280 (All Risks Comprehensive) Pada Kapal BG. TRG 06
DOI:
https://doi.org/10.61132/jupiter.v2i5.543Keywords:
risk management, hull insurance, claimAbstract
This qualitative study aims to examine the implementation of risk management in hull insurance by collecting data through interviews with the risk management staff of Asuransi Mitra Pelindung Mustika Ltd. The findings revealed that this company has applied the risk management process, including risk identification, risk analysis, risk evaluation, risk control, risk transfer through other insurance policies, monitoring, and review. The company covers losses due to fire, explosion, violent theft, piracy, accidents involving installations, collisions with aircraft or similar objects, earthquakes, volcanic eruptions, lightning strikes, accidents during loading or refuelling, boiler explosions, machinery shaft breakage, or latent defects in the machinery, hull, or frame of the insured vessel. Asuransi Mitra Pelindung Mustika Ltd. also compensates for losses due to the negligence of the captain, officers, or crew of the insured vessel, as well as the shipyard. Time to process the claim becomes a significant challenge in fulfilling the insured's rights in the claim for the BG. TRG 06 vessel because it takes up to 14 days to gather all the necessary documents. This company will cover all repair costs and labor expenses, with an estimated total value of IDR 7,611,100,000.00.
References
Abdulkadir, M. (1999). Hukum Asuransi Indonesia. Bandung: Citra Aditya Bakti.
Anwar, S. (2011). Klaim Risiko Dalam Sistem Transportasi Laut. Jakarta.
Dewanta, Mukti F. (2013). Dualisme Penelitian Hukum Normatif dan Empiris. Yogyakarta: Pustaka Pelajar.
Djojosoedarso. (1999). Prinsip-prinsip Manajemen Risiko dan Asuransi. Jakarta: Salemba Empat.
Emmy Pangaribuan Simanjuntak. (1980). Hukum Pertanggungan dan Perkembangannya. Jakarta: BPHN.
Goodacre JK. (1996). Marine Insurance Claim 3rd Ed. London: Witherby &Co. Ltd.
Humaemah Ratu. (2021). Jurnal Syar Insurance . Jakarta: SIJAS.
Kotler P. (2000). Manajemen Pemasaran: Analisis, Per encanaan, Implementasi dan Kontrol. Terjemahan. Ed – 8, jilid 1. Jakarta: Prenhallindo.
Mulyatno, I. P. (2012). Analisa Kekuatan Konstruksi Side Ramp Door Sistem Steel Wire Rope Pada KM. Dharma Kencana II Akibat Beban Statis Dengan Metode Elemen Hingga. Kapal: Jurnal Ilmu Pengetahuan dan Teknologi Kelautan, [Online] Volume 8(3).
Nasution, S. (1996). Metode Research. Jakarta: Bumi Aksara.
Nocco, Brian W. (2006). Enterprise Risk Management: Theory and Practice. Jakarta: Journal Of Applied Corporate Finance, Vol. 18 (4).
R. Wirjono Prodjodikoro. (1987). Hukum Asuransi di Indonesia . Jakarta: Intermasa.
Rangkuti, F. (2006). Measuring Customer Satisfaction: Teknik Mengukur dan Strategi Meningkatkan Kepuasan Pelanggan & Analisis Kasus PLN – JP. Jakarta: PT. Gramedia Pustaka Utama.
Robert Tampubolon. (2005). Risk and Systems-Based Internal Auditing. Jakarta: PT Elex Media Komputindo.
Sentosa Sembiring. (2014). Hukum Asuransi. Bandung: Nuansa Aulia.
Silalahi, U. M. (2016). Analisis Pengaruh Variasi Sarat Tongkang Terhadap Ekonomis Pemasukan (Income) Pengangkutan Muatan dan Operasional Tugboat. Jurnal Teknik Perkapalan, [Online] Volume 4(1).
Siti Nurbaiti. (2009). Hukum Pengangkutan Darat (Jalan dan Kereta Api). Jakarta: Universitas Trisakti.
Sri Rejeki Hartono. (2001). Hukum Asuransi dan Perusahaan Asuransi. Jakarta: Sinar Grafika.
Tuti Triyanti Gondhokusumo. (1982). Pengangkutan Melalui Laut. Semarang: Fakultas Hukum Universitas Diponegoro.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.