Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz
DOI:
https://doi.org/10.61132/jupiter.v2i1.65Keywords:
Workload, Human Resourcs, Full Time Equivalent.Abstract
- XYZ is one of the largest manufacturers of bus houses in Indonesia as a safe and reliable means of transportation with almost 50 years of experience. In carrying out the production process, employees are required to always be optimal in completing their work, but on the other hand, employees have limited workloads. The aim of this research is to determine the workload conditions received by Salvagnini CNC Laser machine operators, as well as to provide suggestions for improvements to the preparation department (Salvagnini). In order to find out the workload conditions for operators from this department, workload calculations are carried out using the FTE (Full Time Equivalent) method which is obtained from observing job descriptions, units of output or types of activities produced by operators (units/activities), vol-umes containing the number of production results. , as well as the duration of work carried out by the operator. The operator's workload conditions on the first and third days were FTE values of 0.671 and 0.949 (underload) because the FTE value was <0.99, while on the second day the workload condition was 1.033 (fit) because the FTE value was between 1-1.28.
References
Adipradana. (2008). Analisis Beban Kerja. Jakarta : Raih Asa Sukses, 89.
Dewi, U. dan Satrya, A. (2012). Analisis Kebutuhan Tenaga Kerja Berdasarkan Beban Kerja Karyawan Pada PT PLN (Persero) Distribusi Jakarta Raya dan Tangerang Bidang Sumber Daya Manusia dan Organisasi. Depok : Jurusan Manajemen SDM Fakultas Ekonomi Universitas Indonesia.
Hanan Muhardiansyah, Y. W. (2018). Workload Analysis Dengan Metode Full Time Equivalent ( Fte ) Untuk Menentukan Kebutuhan Tenaga Kerja Pada Dept . Produksi Unit Betalactam Phapros, P T. Industrial Engi-neering Online Journal, v(Vol.6), 1–8. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/20410
Hermanto, H., & Widiyarini, W. (2020). Analisis Beban Kerja Dengan Metode Workload Analysis (WLA) Dalam Menentukan Jumlah Tenaga Kerja Optimal Di PT INDOJT. Performa: Media Ilmiah Teknik Industri, 19(2), 247–256. https://doi.org/10.20961/performa.19.2.46467
Kurniawan, H. S. (2020). Analisis Beban Kerja Karyawan PT. Xyz Indonesia Pada Bagian Insulation Menggunka-na Metode Full Time Equivalent. STRING (Satuan Tulisan Riset dan Inovasi Teknologi . Vol. 5 No. 2 Desember 2020, 144-152. https://index.php/STRING/article/view/7783/3509
Manuaba. (2000). Hubungan Beban Kerja dan Kapasitas Kerja. Rinek Cipta.
Rivai, V. (2005). Manajemen Sumber Daya Manusia. Jakarta: Raja Grafindo Persada.
Susilo. (2002). Manajemen Sumber Daya manusia. Yogyakarta : BPFE
Tarwaka, Sholichul, L. S. (2004). Ergonomi Untuk Keselamatan, Kesehatan Kerja dan Produktivitas. UNIBA PRESS.
Yasmin, Z. A., & Ariyanti, S. (2019). Analisis Beban Kerja Pada Maintenance Bd-Check Dengan Metode Full Time Equivalent. Jurnal Ilmiah Teknik Industri, 6(1), 55–62. https://doi.org/10.24912/jitiuntar.v6i1.3024
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.