Literature Review: Pemanfaatan Building Information Modeling (BIM) dalam Konstruksi sebagai Alat Komunikasi dan Kolaborasi dalam Integrated Project Delivery (IPD)
DOI:
https://doi.org/10.61132/konstruksi.v3i4.1018Keywords:
Building Information Modeling, Construction Management, Integrated Project Delivery, Project Communication, Team CollaborationAbstract
Building Information Modeling (BIM) is a technology increasingly used in the modern construction industry, particularly to improve communication efficiency and collaboration between stakeholders. This technology enables the integration of project data and information into a comprehensive digital model, allowing all involved parties to access, verify, and update information in real time. This study aims to evaluate the strategic role of BIM as a communication medium in the Integrated Project Delivery (IPD) approach, focusing on the planning stage involving the disciplines of architecture, structure, and Mechanical, Electrical, and Plumbing (MEP) systems. The IPD approach emphasizes cross-disciplinary collaboration from the early stages of a project to optimize outcomes, reduce risks, and accelerate completion. The research methods used are literature review and case study analysis of various projects that have implemented BIM within the IPD framework. The data analyzed include the effectiveness of information exchange, inter-team coordination, and early identification of design conflicts. The study results show that BIM significantly improves information transparency among stakeholders, minimizes the risk of miscommunication, and accelerates the decision-making process through accurate and integrated data visualization. BIM models also facilitate the detection of potential conflicts, such as clashes between structural and MEP elements, before entering the physical construction phase, thereby reducing repair costs and delays. Furthermore, the use of BIM in IPD fosters a more collaborative work culture, where architects, engineers, and contractors can work together to solve problems quickly and effectively. Thus, BIM has proven to play a crucial role as a primary communication tool in IPD implementation, while also serving as a crucial foundation for achieving efficient, integrated, and high-quality construction project management.
References
Alrizqi, M. R., & Fazri, I. (2023). Keuntungan, batasan, dan tantangan penggunaan building information modeling dalam proses pembelajaran. ARCHVISUAL: Jurnal Arsitektur dan Perkotaan, 3(1). https://doi.org/10.55300/archvisual.v3i1.1712
Antoni, F., Despa, D., & Widyawati, D. R. (2023). Peran implementasi building information modelling (BIM) terhadap kinerja proyek Jalan Tol Kayuagung–Palembang–Betung tahap II STA 67+400–75+000. Seminar Nasional Insinyur Profesional (SNIP). https://doi.org/10.23960/snip.v3i1.403
Aziz, M. A., Wong, C. F., Haron, N. A., Ales, A. H., Effendi, R. A. A. R. A., & Tan, O. K. (2022). Critical success factors for building information modelling (BIM) implementation for power plant projects in Malaysia. IIUM Engineering Journal, 23(1), 34–45. https://doi.org/10.31436/iiumej.v23i1.2119
Berlian, C. A., & Adhi, R. P. (2016). Perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode building information modelling (BIM) dan konvensional (Studi kasus: Perencanaan gedung 20 lantai). Jurnal Karya Teknik Sipil S1 Undip, 5(2). http://ejournal-s1.undip.ac.id/index.php/jkts
Berlian, C. A., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode building information modelling (BIM) dan konvensional (Studi kasus: Perencanaan gedung 20 lantai). Jurnal Karya Teknik Sipil S1 Undip, 5(2), 220–229.
Dalui, P., Elghaish, F., Brooks, T., & McIlwaine, S. (2021). Integrated project delivery with BIM: A methodical approach within the UK consulting sector. Journal of Information Technology in Construction, 26, 922–935. https://doi.org/10.36680/j.itcon.2021.049
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, architects, engineers and contractors. John Wiley & Sons.
Fanani, M. R., & Setiawan, A. (2024). Implementasi BIM dalam integrated project delivery untuk menentukan kompensasi risk/reward (Studi kasus: Mosaic Centre, Kanada). Jurnal Lingkungan Binaan Indonesia, 13(4), 207–216. https://doi.org/10.32315/jlbi.v13i4.415
Friastri, S., & Setiawan, A. (2024). Systematic literature review: Peranan metode BIM dalam integrated project delivery (IPD) untuk mencapai triple constraint. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 7(1), 39–46. https://doi.org/10.54367/jrkms.v7i1.3182
Hartono, W., Handayani, D., & Prasetya, N. (2024). Variabel berpengaruh dalam implementasi building information modeling (BIM) dengan keselamatan dan kesehatan kerja (K3) untuk meminimalisasi kecelakaan kerja pada tahap perancanaan proyek konstruksi. Matriks Teknik Sipil, 11(3), 270. https://doi.org/10.20961/mateksi.v11i3.76638
Hatmoko, J. U. D., Fundra, Y., Wibowo, M. A., & Zhabrinna. (2019). Investigating building information modelling (BIM) adoption in Indonesia construction industry. MATEC Web of Conferences, 258, 02006. https://doi.org/10.1051/matecconf/201925802006
Karasu, T., Aaltonen, K., & Haapasalo, H. (2023). The interplay of IPD and BIM: A systematic literature review. Construction Innovation, 23(3), 640–664. https://doi.org/10.1108/CI-07-2021-0134
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2018). Prinsip dasar sistem teknologi BIM dan implementasinya di Indonesia.
Khilda, F. A., & Setiawan, A. (2024). Kolaborasi berbasis BIM dengan metode IPD studi kasus Cathedral Hill Hospital. Jurnal Arsitektur GRID, 6(2), 58–68.
Kraatz, J. A., & Hampson, K. D. (2013). Brokering innovation to better leverage R&D investment. Building Research & Information, 41(2), 187–197. https://doi.org/10.1080/09613218.2013.749771
Manullang, M., & Rini, R. (2025). Optimalisasi manajemen proyek konstruksi berbasis teknologi digital: Studi efisiensi biaya dan waktu pada pembangunan infrastruktur perkotaan. All Fields of Science Journal Liaison Academia and Society, 5(2), 113–125. https://doi.org/10.58939/afosj-las.v5i2.1033
Mentari, D. S., & Mutaqi, A. S. (2024). Faktor komunikasi dan kolaborasi dalam integrated project delivery. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 7(1), 31–37. https://doi.org/10.54367/jrkms.v7i1.3165
Mohamed Salleh, R., Mustaffa, N. E., Abdul Rahiman, N., Tajul Ariffin, H. L., & Othman, N. (2019). The propensity of building information modelling and integrated project delivery in building construction project. International Journal of Built Environment and Sustainability, 6(1–2), 83–90. https://doi.org/10.11113/ijbes.v6.n1-2.386
Nguyen, P., & Akhavian, R. (2019). Synergistic effect of integrated project delivery, lean construction, and building information modeling on project performance measures: A quantitative and qualitative analysis. Advances in Civil Engineering, 2019. https://doi.org/10.1155/2019/1267048
Ozorhon, B., & Karahan, U. (2016). Critical success factors of building information modeling implementation. Journal of Management in Engineering, 33(3), 04016054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000505
Piroozfar, P., Farr, E. R. P., Zadeh, A. H. M., Inacio, S. T., Kilgallon, S., & Jin, R. (2019). Facilitating building information modelling (BIM) using integrated project delivery (IPD): A UK perspective. Journal of Building Engineering, 26, 100907. https://doi.org/10.1016/j.jobe.2019.100907
Purwanto, L. M. F. (2024). Transformasi digital dalam arsitektur: Perpaduan inovasi teknologi dan kreativitas desain. JoDA Journal of Digital Architecture, 4(1), 1–2. https://doi.org/10.24167/joda.v4i1.12779
Putera, I. G. A. (2022). Manfaat BIM dalam konstruksi gedung: Suatu kajian pustaka. Jurnal Ilmiah Teknik Sipil, 26, 43–50. https://doi.org/10.24843/JITS.2022.v26.i01.p06
Rahim, S. A., Mohd Nawi, M. N., & Nifa, F. A. A. (2016). Integrated project delivery (IPD): A collaborative approach to improve the construction industry. Advanced Science Letters, 22(5–6), 1331–1335. https://doi.org/10.1166/asl.2016.6764
Raisbeck, P. (2010). Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. https://www.researchgate.net/publication/265948536
Rashidian, S., Drogemuller, R., & Omrani, S. (2024). An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), 1454–1470. https://doi.org/10.1080/17452007.2024.2383718
Sangadji, S., Kristiawan, S. A., & Saputra, I. K. (2019). Pengaplikasian building information modeling (BIM) dalam desain bangunan gedung. Matriks Teknik Sipil, 7(4). https://doi.org/10.20961/mateksi.v7i4.38475
Sepasgozar, S. M. E., Costin, A., & Wang, C. (2016, July 21). Challenges of migrating from desktop-based BIM in construction. Proceedings of the International Symposium on Automation and Robotics in Construction. https://doi.org/10.22260/ISARC2016/0112
The American Institute of Architects. (2014). Integrated project delivery: An updated working definition. The American Institute of Architects.
Wang, T., & Chen, H.-M. (2023). Integration of building information modeling and project management in construction project life cycle. Automation in Construction, 150, 104832. https://doi.org/10.1016/j.autcon.2023.104832
Wibowo, A., Adi, H. P., & Poedjiastoeti, H. (2022). Evaluasi penerapan building information modeling (BIM) pada proyek gedung Workshop Politeknik Pekerjaan Umum di Semarang. Jurnal XYZ, 7(5).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.