Efektivitas dan Akurasi Metode Manual dan Bim dalam Perhitungan Volume Pile Cap dan Pembesian Bangunan Gedung

Authors

  • Gazalba Imaduddin Sholeh Universitas Sebelas Maret

DOI:

https://doi.org/10.61132/konstruksi.v3i2.786

Keywords:

Building Information Modeling (BIM), calculation effectiveness, construction efficiency, manual method, pile cap, volume calculation

Abstract

In the modern construction industry, accuracy and efficiency in volume calculations are crucial aspects of project success. This study compares two methods for calculating the volume of pile caps and reinforcement: the manual method and the Building Information Modeling (BIM)-based method. The manual method has long been used but has limitations in terms of time efficiency and a higher risk of errors. In contrast, the BIM method offers more accurate and efficient calculations through software-based digital modeling. This study employs a descriptive-comparative quantitative approach by analyzing volume calculation data using both methods. The results indicate that the BIM method has a higher level of accuracy, with a concrete volume of 1,822.87 m³ and reinforcement of 148,862.80 kg, compared to the manual method, which produced a concrete volume of 1,842.17 m³ and reinforcement of 150,279.05 kg. The comparison of pile cap volume calculations shows that the BIM method achieves 98.95% effectiveness in concrete volume calculations and 99.06% effectiveness in reinforcement calculations compared to the manual method. Additionally, the BIM method has proven to be more efficient in reducing calculation time and minimizing input errors. Thus, BIM is more recommended for large-scale projects that require high accuracy and efficiency in construction volume calculations. However, the manual method remains relevant as a validation tool and for small projects with technological limitations. This study highlights the importance of adopting digital technology in the construction industry to enhance productivity and project planning effectiveness.

 

 

References

Fadillah, M., & Nofriadi. (2022) Quantity Take-Off Pekerjaan Struktur Berbasis Building Information Modeling (BIM) Pembangunan Gedung Kantor Pelayanan Pajak Pratama Balige. Jurnal Ilmiah Teknik Sipil Agregat, 2 (1), 24-25. https://doi.org/10.51510/agregat.v2i1.733

Hardani, Andriani, H., Ustiawaty, J., Utami, E. F., Istiqomah, R. R., Fardani, R. A., Sukmana, D. J., Auliya, N. H. (2020). Metode Penelitian Kualitatif & Kuantitatif. Pustaka Ilmu. Yogyakarta.

⁠Juliani, M. P., & Renaningsih. (2023). Analisa Perbandingan Volume Beton Metode Konvensional Pada Hasil (BQ) Dan BIM Autodesk Revit 2020 Terhadap Efektivitas Biaya. 632.

Maghfirona, A., Amar, T. I. K., & Failasufa, A. A. M. H. (2023). Analisis Komparasi Quantity Take Off Pekerjaan Struktur Berdasarkan Metode Konvensional Dan Metode BIM (Studi Kasus : Perencanaan Omah DW). Jurnal Teslink : Teknik Sipil dan Lingkungan, 5 (1), 61. https://doi.org/10.52005/teslink.v5i2.272

Putri, D., A., Herzanita, A., & Ihsani, I. (2024). Analisis Perbandingan Rumus Perhitungan Quantity Take Off Menggunakan Metode BIM Dan Konvensional Pada Pekerjaan Struktur Studi Kasus: Proyek Pembangunan Unit Sekolah X. Jurnal Artesis, 4 (2), 175. https://doi.org/10.35814/artesis.v4i2.7859

Putri, E. A., Armaeni, N. K., & Triswandana, I. W. G. E. (2023). Perencanaan Pelaksanaan Pekerjaan Pile Cap Pada Proyek Pembangunan Gedung IGD UPT Rumah Sakit Nyitdah Tabanan. Jurnal Teknik Gradien, 15 (1), 5. https://doi.org/10.47329/teknik_gradien.v15i01.1010

Simanjuntak, M. R. A., & Baskoro, A. T. (2020) Kajian Faktor - Faktor Manajemen Pembiayaan Proyek Dalam Implementasi BIM Pada Proyek Bangunan Gedung. 415.

Utari, R. P., & Pradana, N. (2023). Implementasi Sistem Building Information Modeling (BIM) Untuk Analisis Waktu dan Biaya (Studi Kasus Proyek Pembangunan Gedung Rumah Sakit Universitas Islam Malang). Jurnal Ilmiah Universitas Batanghari Jambi, 23 (2), 1246. http://dx.doi.org/10.33087/jiubj.v23i2.3994

⁠Zahrah, K., Lenggogeni, & Berliana, R. (2023) Implementasi BIM Dalam Perhitungan Quantity TAke-Off Pekerjaan Struktur Dan Arsitektur Proyek RTCT PERTAMINA. Jurnal Deformasi, 8 (2), 190. https://doi.org/10.31851/deformasi.v8i2.13407

Zain, H. A., Mulyono, B., & Sudibyo, G. H. (2022). Analisis Perbandingan Efektivitas Metode Konvensional dan BIM Pada Elemen Struktur Beton (Studi Kasus Gedung Pelayanan Pendidikan FISIP UNSOED). Jurnal Disprotek, 13 (1), 37. https://doi.org/10.34001/jdpt.v13i1.3078

Downloads

Published

2025-03-19

How to Cite

Gazalba Imaduddin Sholeh. (2025). Efektivitas dan Akurasi Metode Manual dan Bim dalam Perhitungan Volume Pile Cap dan Pembesian Bangunan Gedung. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 3(2), 89–101. https://doi.org/10.61132/konstruksi.v3i2.786

Similar Articles

1 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.