Pengembangan Model Estimasi Konseptual Biaya Pembangunan Gedung Rumah Sakit Menggunakan Cost Significant Model

Authors

  • Putu A.A. Aptiyasa Universitas Nani Bili Nusantara
  • Cosmas P.Y. Pao Effi Universitas Nani Bili Nusantara
  • Stefanus Rada Universitas Nani Bili Nusantara

DOI:

https://doi.org/10.61132/konstruksi.v3i2.777

Keywords:

Cost significant model, estimated cost, hospital building

Abstract

Implementation of the hospital building project, have a ways of estimation in accordance with the phases of the project. In the early stages of project planning, (owner) requires the estimated cost to construct the project budget. So it is necessary to develop cost estimation model that is easy to use, accurate and reliable. This research planning to develop a model estimation on stage initial project planning, easy with a fairly accurate result. Development method uses the principle of " Cost Significant Model" and the multiple linear regression. 6 data obtained using the method of work packages BoQ (Bill of Quantity) hospital building with details of data among 5 work packages that have been realized from fiscal year 2011 - 2014 were compared with 1 package of work to be performed

References

Anonim. (2009). Undang-Undang Republik Indonesia No. 44 Tahun 2009 Pasal 1 tentang Rumah Sakit. Jakarta: Departemen Kementerian Kesehatan.

Anonim. (2014). Data rumah sakit online - Kementerian Kesehatan RI tentang rumah sakit. Jakarta: Departemen Kementerian Kesehatan.

Arikunto, S. (2010). Prosedur penelitian: Suatu pendekatan praktik. Jakarta: Rineka Cipta.

Badan Pusat Statistik (BPS). (2010). Data inflasi Kabupaten Klaten. Diakses pada 8 Desember 2014, dari http://klatenkab.go.id/web/content/daftar-rumah-sakit-di-klaten.

Burhan. (2004). Statistik terapan untuk penelitian ilmu-ilmu sosial. Yogyakarta: Gadjah Mada University Press.

Ervianto, W. (2002). Manajemen proyek konstruksi. Yogyakarta: Andi Offset.

Ghozali, I. (2001). Analisis multivariate program SPSS 19. Semarang: Badan Penerbit Universitas Diponegoro.

Husen, A. (2009). Manajemen proyek perencanaan, penjadwalan & pengendalian proyek. Yogyakarta: Andi.

Kan, P. (2002). Parametric cost estimation model for conceptual cost estimating of building construction projects (Tesis). The University of Texas at Austin.

Kodoatie, R. J. (1995). Analisis ekonomi teknik. Yogyakarta: Andi Offset.

Pemayun. (2003). Praktek estimasi biaya dengan metode “Cost Significant Model” pada bangunan gedung yang memakai arsitektur Bali (Tesis). Universitas Atma Jaya, Yogyakarta.

Poh, K. L., & Horner, M. (1995). Cost-significant modelling: Its potential for use in South-East Asia. Engineering, Construction and Architectural Management.

Rifat. (2004). Conceptual cost estimation of building projects with regression analysis and neural networks. Canadian Journal of Civil Engineering.

Soeharto, I. (1995). Manajemen proyek dari konseptual sampai operasional. Jakarta: Erlangga.

Soeharto, I. (1997). Manajemen proyek dari konseptual sampai operasional. Jakarta: Erlangga.

Sudiarta. (2011). Estimasi biaya konseptual konstruksi gedung dengan faktor kapasitas biaya (Tesis). Universitas Udayana, Bali.

Sugiyono. (2011). Statistika untuk penelitian. Bandung: CV Alfabeta.

Ulwan. (2014). Uji normalitas menggunakan SPSS. Diakses pada 19 Desember 2014, dari http://portal-statistik.blogspot.com/2014/02/uji-normalitas-dengan-menggunakan-spss.html.

Downloads

Published

2025-03-10

How to Cite

Putu A.A. Aptiyasa, Cosmas P.Y. Pao Effi, & Stefanus Rada. (2025). Pengembangan Model Estimasi Konseptual Biaya Pembangunan Gedung Rumah Sakit Menggunakan Cost Significant Model. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 3(2), 76–88. https://doi.org/10.61132/konstruksi.v3i2.777

Similar Articles

1 2 3 4 > >> 

You may also start an advanced similarity search for this article.