Faktor Utama Keberhasilan Proyek Bangunan Elektronik di Kab. Enrekang

Authors

  • Ahmad Mahatir H Universitas Muhammadiyah Parepare

DOI:

https://doi.org/10.61132/konstruksi.v2i4.525

Keywords:

building projects, project success, dominant variables cost, quality and K3L

Abstract

This study aims to identify the success factors of building projects. The method used was data collection through questionnaires filled out by 30 respondents, including project owners, survey consultants, contractors, supervisors, and foremen. The results of validity and reliability tests showed that the variables of cost (X1), time (X2), quality (X3), and safety (K3L) were valid as they had an r-value greater than the r-table value of 0.361. The data analysis results indicated that the dominant factors influencing the success of building projects in the hypothesis testing were the t-values: Cost (X1) at 3.514, Time (X2) at 3.64, Quality (X3) at 4.66, and Safety (K3L) at 3.342. It can be concluded that the variables of Cost and Safety (K3L) are more significant or dominant compared to Quality and Time.

 

References

Antononi, A., & Waluyo, R. (2013). Faktor-Faktor Penentu Keberhasilan Pelaksanaan Proyek Perumahan Berdasarkan Mutu, Biaya dan Waktu. Jurnal Teknik Sipil, 12(3), 192-201.

Firdausi, A. A., Saputra, A., & Aminullah, A. (2020). Studi Eksplorasi Faktor-Faktor Kesuksesan Proyek Konstruksi di Indonesia. Journal of Civil Engineering and Planning (JCEP), 1(2), 169-182

Kamagi, G. P., Tjakra, J., Langi, J. E. C., & Malingkas, G. Y. (2013). Analisis Life Cycle Cost Pada Pembangunan Gedung (Studi Kasus: Proyek Bangunan Rukan Bahu Mall Manado). Jurnal Sipil Statik, 1(8).

M.Jamin Peju,2014, “Konsiderasi Pengintegrisian Teknik Rekayasa Nilai dan Manajemen Resiko Proyek Tahap Konstruksi Pengaruhnya pada Pencapaian Sasaran dan Kesuksesan Proyek” Jurnal Ilmiah Media Enginering Vol.4 No.3 November 2014, ISSN: 2087-9334, Universitas Sam Ratulangi.

Nazeni, I. (2010). Manajemen Proyek. Penerbit Universitas Indonesia. Jakarta.

Putra, A. H. P. K., Said, S., & Hasan, S. (2017). Pengaruh Karakteristik Toko dan Produk bagi Konsumen di Indonesia terhadap Pembelian Impulsif. Jurnal Manajemen dan Kewirausahaan, 5(2), 8-19.

Setiawan, dkk. (2012). Indikator Keberhasilan Proyek Pembangunan Bangunan Gedung yang Dipengaruhi Faktor Internal Site Manager. Jurnal Manajemen Proyek.3(1), 58–67.

Published

2024-08-22

How to Cite

Ahmad Mahatir H. (2024). Faktor Utama Keberhasilan Proyek Bangunan Elektronik di Kab. Enrekang. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 2(4), 90–98. https://doi.org/10.61132/konstruksi.v2i4.525

Similar Articles

<< < 1 2 3 4 > >> 

You may also start an advanced similarity search for this article.