Analisis Debit Air Alokasi dengan Debit Air Nyata di Bangunan Sadap pada Saluran Sekunder Daerah Irigasi Colo Timur
DOI:
https://doi.org/10.61132/konstruksi.v2i4.546Keywords:
Irrigation Area, RWDI, Tertiary Turns Out, Water IrrigationAbstract
The Colo Timur Irrigation Area covers 20,601.80 hectares with a main canal length of 64.15 km, passing through the regencies of Sukoharjo, Karanganyar, Sragen, and Ngawi. The water flow comes from the Wonogiri Serbaguna Dam, which is dammed by the Colo Weir in Sukoharjo. This irrigation area faces issues with uneven water distribution, and there is a need to check the water irrigation from the intake gates to conclude whether the operation and maintenance of the irrigation network are in accordance with standards. The study was conducted on the secondary canals of Geneng, Pulosari, and Krikilan, which are located upstream, midstream, and downstream, respectively. On the Geneng secondary canal, measurements were taken at B CT 5, Ge 1, and Ge 8 Ka. On the Pulosari secondary canal, measurements were taken at B CT 29, BPo 1, BPo 12 Ka, and BPo 12 Ki. On the Krikilan secondary canal, measurements were taken at B CT 40, Kk 1 Ka, and Kk 1 Ki. This study uses the Ratio of Water Distribution Implementation (RWDI) to determine the category of water distribution. The water discharge from the intake gates does not match the allocated water discharge. Factors causing the discrepancy in water discharge include (a) intake gates not being opened according to plan, (b) the presence of water pumps in the canals reducing irrigation water, and (c) the field operation system implementing water distribution rotations.
References
Badan Standarisasi Nasional. (2015). Tata cara pengukuran debit aliran sungai dan saluran terbuka menggunakan alat ukur arus dan pelampung.
Balai Besar Wilayah Sungai (BBWS) Bengawan Solo. (2019). Kegiatan monitoring dan evaluasi kegiatan DI TPOP.
Bambang Triatmodjo. (2009). Hidrologi terapan.
Bambang Triatmodjo. (2017). Hidraulika 1.
Bunganaen, W. (2011). Analisis efisiensi dan kehilangan air pada jaringan utama daerah irigasi Air Sagu.
Direktorat Jenderal Sumber Daya Air. (2013). Standar perencanaan irigasi, kriteria perencanaan bagian saluran KP-03.
Intifaidah, D. N., Widiarti, W. Y., & Saifurridzal. (2023). Evaluasi dan monitoring bangunan ukur debit pada saluran primer Kesilir Kecamatan Wuluhan. Jurnal Teknik Sipil, 20(1), 55–64.
Kementerian Pekerjaan Umum, Republik Indonesia. (2005). Penguatan masyarakat petani pemakai air dalam operasi dan pemeliharaan jaringan irigasi (Kepmen PU No. 498/KPTS/M/2005).
Kurniadi, A. (2023). Analisis efisiensi dan kehilangan air pada saluran sekunder Bialo D.I. Bettu Kabupaten Bulukumba.
PT Geodinamik Konsultan. (2020). Draft laporan akhir penyusunan manual OP jaringan irigasi wilayah Sungai Bengawan Solo.
Sunaryo. (2020). Analisis kehilangan air irigasi pada saluran primer dan sekunder daerah irigasi Rentang Jawa Barat.
Tri Rahajeng, E. A. (2012). Kinerja sistem irigasi daerah irigasi (DI) Krisak Kabupaten Wonogiri.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.