Perhitungan Biaya Pengupasan dan Pengangkutan Overburden pada PIT 3000 Blok 12 PT Trubaindo Coal Mining

Authors

  • Liganic Saprudin Universitas Mulawarman
  • Agus Winarno Universitas Mulawarman
  • Henny Magdalena Universitas Mulawarman
  • Windhu Nugroho Universitas Mulawarman

DOI:

https://doi.org/10.61132/manufaktur.v3i2.874

Keywords:

Cost, Overburden, Calculation

Abstract

In stripping overburden activities, calculate the costs in order to provide an overview of the costs that will be incurred by the company. The purpose is to provide an overview of the costs that will be incurred by the company. The results of the research that has been done are as follows with a target of overburden stripping target of 480,000 BCM, Productivity of Komatsu PC digging equipment 300 fleet 1 217.35 BCM/hour, Komatsu PC 300 fleet 2 digging tool productivity 226.22 BCM/hour and Komatsu PC 400 fleet 3 285.87 BCM/hour. Cost The cost of digging equipment ownership is Rp. 172,347/hour and the operational cost of digging equipment is Rp. 3,415,959/hour. The cost of ownership of the conveyance is Rp. 404,437/hour and the operational cost of the conveyance is Rp. 3,415,959/hour. operational costs Rp. 3,502,939 / hour. The company certainly incurs production costs. One of which is operational costs, therefore it is necessary to

References

Andreas, A., & Yulhendra, D. (2014). Perencanaan biaya dan kebutuhan alat muat dan angkut pada lokasi penambangan area 242, 3Ha batu kapur PT. Semen Padang. Jurnal Teknik, Universitas Negeri Padang.

Arif, I. (1996). Diktat kuliah TA 427: Tambang terbuka. Institut Teknologi Bandung.

Bachtiar, A. (2004). Kerangka stratigrafi sekuen dan karakter batuan induk Misoen Awal di Cekungan Kutai Hilir, Kalimantan Timur (Disertasi Program Doktor). Institut Teknologi Bandung.

Bangun, F. T. A. (2009). Pengembangan tanah mekanik (PTM) dan alat-alat berat. Universitas Sumatera Utara.

Dania, P., Widayati, S., & Zaenal. (2018). Evaluasi biaya kepemilikan (owning cost) dan biaya operasi (operating cost) dump truck Hino Ranger FF 173 MA pada penambangan batu andesit di CV Panghegar, Blok Gunung Patapaan, Desa Cilalawi, Kecamatan Sukatani, Kabupaten Purwakarta, Provinsi Jawa Barat. Prosiding Teknik Pertambangan.

Hadi, S. (2020). Pengamatan pola muat terhadap produktivitas alat gali muat pada pengupasan lapisan tanah penutup. Jurnal Poros Teknik.

Hardila, Q. D., Ansosry, A., & Maiyudi, R. (2021). Perbandingan pengupasan material overburden berdasarkan data aktual, data ritase, dan data survey pada Bukit Everest PT. ANTAM Tbk. UBPN Sulawesi Tenggara. Bina Tambang.

Hidayat, T., Asmiani, N., & Arifin, M. (2023). Perhitungan biaya pengupasan overburden pada PIT Eagle 1 PT Internasional Prima Coal Kota Samarinda.

Hikmawati. (2023). Studi perhitungan biaya pada kegiatan pengupasan overburden pada PIT 5 PT Indochin Resources Jobsite PT Energi Cahaya Industritama. Journal of Media, Sciences and Education, 2(3).

Indonesianto, Y. (2011). Pemindahan tanah mekanis. UPN “Veteran” Yogyakarta.

Kusrin, M. S. T. (2008). Pemindahan tanah mekanik dan alat berat. Semarang: Semarang University Press.

Magdalena, H. (2023). Valuasi tambang untuk engineer dan manajer. Samarinda: Mulawarman University Press.

Moss, S. J., & Chambers, J. L. C. (1999). Depositional modelling and facies architecture of rift and inversion in the Kutai Basin, Kalimantan, Indonesia. Indonesian Petroleum Association, Proceedings 27th Annual Convention, Jakarta.

Mukiat, M. S. (2023). Analisis investasi tambang. Palembang: Awfa Smart Media.

Parulian, B., & Syarip, F. (2022). Analisa pengaruh produktivitas terhadap biaya operasional pada proyek penggalian ex disposal NW01B guna pengambilan batubara di PT. Pamapersada Nusantara Distrik KMIA. Jurnal Pendidikan Ekonomi Undiksha.

Prodjosumarto. (2000). Pemindahan tanah mekanis. Bandung: Teknik Pertambangan ITB.

Rochmanhadi. (1985). Perhitungan biaya pelaksanaan pekerjaan dengan menggunakan alat-alat berat. Departemen Pekerjaan Umum.

Rochmanhadi. (1990). Alat-alat berat dan penggunaannya. Departemen Pekerjaan Umum.

Saputra, D., Yulhendra, D., Octova, A., & Nata, R. A. (2022). Mencapai target produksi pengupasan overburden 43.700 bcm/bulan menggunakan metode Overall Equipment Effectiveness (OEE) di PT. Mineral Sukses Makmur, Site Lolo, Kecamatan Pantai Cermin.

Sidiq, H., & Puspita Sari, L. (2020). Evaluasi waktu operasional pengupasan overburden Bukit Wrangler Area Tambang Utara UBPN PT. Antam Tbk, Pomalaa Sulawesi Tenggara. Mining Insight.

Stermole, F. J., & Stermole, J. M. (2000). Economic evaluation and investment decision methods. Investment Evaluation Corporation.

Zarly, Y. F., & Kasim, T. (2018). Kajian teknis loading dan hauling produksi overburden pada tambang terbuka PT. Allied Indo Coal Jaya, Parambahan, Sawahlunto. Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang.

Downloads

Published

2025-06-04

How to Cite

Liganic Saprudin, Agus Winarno, Henny Magdalena, & Windhu Nugroho. (2025). Perhitungan Biaya Pengupasan dan Pengangkutan Overburden pada PIT 3000 Blok 12 PT Trubaindo Coal Mining. Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri, 3(2), 12–19. https://doi.org/10.61132/manufaktur.v3i2.874

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.