Analisis Coal Recovery dan Coal Losses pada Rangkaian Penambangan PIT X PT. Jembayan Muarabara Kutai Kartanegara, Kalimantan Timur

Authors

  • Evita Endar Apriliana Universitas Mulawarman
  • Windhu Nugroho Universitas Mulawarman
  • Henny Magdalena Universitas Mulawarman
  • Shalaho Dyna Devy Universitas Mulawarman
  • Agus Winarno Universitas Mulawarman

DOI:

https://doi.org/10.61132/venus.v3i3.881

Keywords:

Coal Recovery, Coal Losses, Non Comformity

Abstract

In mining activities, there is often a discrepancy between the plan and the actual conditions in the field, this discrepancy was found after reconciliation at the end of the progress (month). From the mining activities carried out by PT. Jembayan Muarabara (JMB), coal roof floor data was obtained from the survey which was then used to find survey tonnage, model tonnage data and actual tonnage scales. Then from this data it can be used to obtain coal recovery, coal looses in coal cleaning, loading, and coal transportation. The results of the study obtained tonnage data from the survey of 26,201.50 tons, a model of 26,488.50 tons and an actual tonnage of 24,885.09 tons. From the data obtained, the coal recovery value at the research location was 94.98% with coal losses in coal cleaning activities of 4.52% or 1196.39 tons and in loading activities of 0.5% or 120.02 tons with a tonnage discrepancy between planning and actual in the field of 1603.41 tons.

References

Al Qadrie, S. F. F., Syahrudin, Syafrianto, & Khalid, M. (2021). Analisa tingkat kehilangan batubara pada PT. KTC Coal Mining & Energy Jobsite PT. Berkah Bumi Persada di Desa Lemo I Kecamatan Tuweh Tengah Kabupaten Barito Utara Provinsi Kalimantan Tengah. Jurnal PWK, Laut, Sipil, Tambang, 8(2).

Arif, I. (2014). Batubara Indonesia. Jakarta: PT. Gramedia Pustaka Utama.

Baruya, P. (2012). Losses in the coal supply chain. IEA Clean Coal Centre. https://www.iea.org/publications

Celine, S. E. (2022). Rekonsiliasi perencanaan coal expose PIT 4 PT. Adimitra Baratama Nusantara subkontraktor PT. RPP Contractor Indonesia Kecamatan Sanga-sanga Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur (Skripsi, Universitas Mulawarman).

Irfandi, A., Triantoro, A., & Melati, S. (2021). Analisis coal losses pada kegiatan penambangan di PIT Inul Middle Panel 3 PT. Kaltim Prima Coal. Jurnal Himasapta, 6(2).

Kementerian Energi dan Sumber Daya Mineral Republik Indonesia. (2019). Petunjuk teknis pelaksanaan konservasi batubara dalam rangka pengendalian kehilangan dan dilusi pada kegiatan penambangan serta pengelolaan batubara kualitas rendah (Kepdirjen SDKM No. 226.K/30/DJB/2019).

Khoiriah, I. (2018). Analisis coal loses kegiatan penambangan di Blok 4 PT. Inti Bara Perdana, Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu. JP, 2(2). https://doi.org/10.31289/jp.v2i2

Macfarlane, A. S. (2013). Reconciliation along the mining value chain. The Journal of the Southern African Institute of Mining and Metallurgy, 113(9), 679–685.

Menteri Energi dan Sumber Daya Mineral. (2018). Pedoman pelaksanaan kaidah teknik pertambangan yang baik (KEPMEN ESDM No. 1827 K/30/MEM/2018).

Mutia, N., Mukiat, & Sudarmono, D. (2020). Evaluasi realisasi penambangan batubara terhadap rencana blok penambangan PT. Bukit Asam Tbk. Jurnal Pertambangan FT Unsri, 4(1).

Musmualim, I., Eddy, & Suwardi, F. R. (2015). Rekonsiliasi penambangan antara rencana penambangan bulanan dengan realisasi di tambang swakelola B2 PT. Bukit Asam (Persero), Tbk. Universitas Sriwijaya.

Notosiswoyo, S., Lilah, Syafrizal, Heriawan, M. N., & Widayat, A. H. (2005). Diktat mata kuliah metode perhitungan cadangan TE-3232. Institut Teknologi Batubara.

Ramaddandy, D., & Zakri, R. S. (2021). Rekonsiliasi rencana sequence penambangan dengan realisasi di PIT X pada bulan Mei 2021 di PT. Bukit Asam Tbk Tanjung Enim, Sumatera Selatan. Jurnal Bina Tambang, 6(3).

Ramdhani, B. B. (2021). Rekonsiliasi penambangan nikel laterit blok Keuno PIT B pada PT. Djava Berkah Mineral job site Bukit Makmur Istindo Nikeltama Desa Keuno, Kecamatan Petasia Timur, Kabupaten Morowali Utara, Provinsi Sulawesi Tengah (Skripsi, Universitas Sriwijaya).

Saputra, A. R., Ningsih, Y. B., & Suwardi, F. R. (2021). Coal losses pada kegiatan penambangan batubara di PT. X Sumatera Selatan. Jurnal Pertambangan FT Unsri, 5(4).

Speight, J. G. (2005). Handbook of coal analysis. United States: John Wiley & Sons.

Standar Nasional Indonesia. (2019). SNI 5015:2019 – Pedoman pelaporan hasil eksplorasi, sumber daya dan cadangan batubara.

Suhairi, R. (2016). Evaluasi kemajuan tambang bulanan berdasarkan metode survey pada PT XYZ. Universitas Lambung Mangkurat.

Sukandarrumidi. (2014). Batubara dan gambut. Yogyakarta: Gadjah Mada University Press.

Supriatna, S., Rustandi, S., & Rustandi, E. (1995). Peta geologi lembar Samarinda. Bandung: Pusat Penelitian dan Pengembangan Geologi.

Syaifullah, A., & Nugroho, T. (2019). Modul teori praktek peralatan survey. Sekolah Tinggi Pertanahan Nasional.

Downloads

Published

2025-06-09

How to Cite

Evita Endar Apriliana, Windhu Nugroho, Henny Magdalena, Shalaho Dyna Devy, & Agus Winarno. (2025). Analisis Coal Recovery dan Coal Losses pada Rangkaian Penambangan PIT X PT. Jembayan Muarabara Kutai Kartanegara, Kalimantan Timur. Venus: Jurnal Publikasi Rumpun Ilmu Teknik , 3(3), 89–95. https://doi.org/10.61132/venus.v3i3.881

Similar Articles

<< < 1 2 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>