Penjadwalan Penggantian Komponen Penggiling Adonan Bakso Kapasitas 5 kg/Jam
DOI:
https://doi.org/10.61132/globe.v3i4.1225Keywords:
5 Kg/Hour Capacity, Component Replacement, Maintenance Scheduling, Meatball Dough, Meatball GrinderAbstract
Problems in the meatball dough grinder are low production, increasing maintenance costs and disappointed meatball dough customers who receive orders late due to problems with the electric motor, Pulley, V belt, cutting knife. The purpose of the replacement scheduling is to obtain costs, maintenance-repair schedules in the period 2026, and the ratio of maintenance costs to profits. The replacement scheduling method includes collecting previous period maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component working conditions, predicting component life, predicting repairman costs, predicting supporting equipment that will be used in maintenance, predicting the time to replace spare parts or reinstall components after repair, estimating maintenance and repair costs in 2026, and calculating the ratio of maintenance costs to profits. The results of the replacement scheduling show that the maintenance costs in 2026 are IDR 2,530,000 with an estimated rental rate for the meatball dough grinder of IDR 10,000/kg which has the potential to be rented for 1300 hours/year, and the ratio of maintenance costs to profits is 4.9% which implies that the meatball dough grinder with a capacity of 5 kg/hour still has the potential to sell well and is suitable for use in the coming years.
References
Ariyanto, T., & Prasetyo, D. (2021). Preventive maintenance implementation to reduce downtime on food processing machinery. Jurnal Teknologi dan Manajemen Industri, 7(2), 45–52. https://doi.org/10.29207/jtmi.v7i2.782
Chen, X., Li, M., & Wu, Y. (2023). Cost-benefit analysis of preventive maintenance strategies in small manufacturing enterprises. Journal of Manufacturing Systems, 67, 234–245. https://doi.org/10.1016/j.jmsy.2023.01.012
Dhillon, B. S. (2020). Engineering maintenance: A modern approach. CRC Press. https://doi.org/10.1201/9781003045991
Fitriani, R., & Saputra, H. (2022). Analysis of equipment reliability using RCM method in small-scale food industries. International Journal of Engineering Applications, 10(3), 112–118. https://doi.org/10.5281/zenodo.6789012
Hakim, M. R., & Siregar, A. (2023). Optimization of maintenance scheduling using age replacement method. Jurnal Rekayasa Sistem Industri, 12(1), 35–44. https://doi.org/10.26593/jrsi.v12i1.5234.35-44
Hariyanto, A., Suwarto, Suparno, & Septian, O. (2025). Perhitungan konstruksi dan analisa produksi pada modifikasi mesin penggiling daging dan pengaduk adonan bakso bertenaga motor listrik 3/4 HP. MeKanik: Jurnal Ilmiah Bidang Teknik Mesin, 18(1), 34–41. https://ejurnal.polnes.ac.id/index.php/mekanik/article/view/1405/904
Herlambang, B., Choifin, M., & Rohman, M. N. (2025). Analisis variasi RPM motor listrik terhadap variasi dimensi produk pada mesin pemotong bakso kotak. Jurnal V-Mac, 10(1), 8–13. https://doi.org/10.36526/v-mac.v10i1.4228
Mobley, R. K. (2021). An introduction to predictive maintenance (3rd ed.). Butterworth-Heinemann. https://doi.org/10.1016/C2019-0-04625-5
Nakagawa, T. (2020). Advanced reliability models and maintenance policies. Springer. https://doi.org/10.1007/978-1-4471-4971-2
Prasetyo, A. D., & Nadliroh, K. (2022). Meat grinding machine design on meatball printing machine capacity 2kg. In Seminar Nasional Inovasi Teknologi UN PGRI Kediri (pp. 272–279). https://proceeding.unpkediri.ac.id/index.php/inotek/article/download/2595/1623/9701
Putra, Y. F., & Wibowo, S. (2020). Impact of improper maintenance on machine performance in SMEs. Journal of Production Systems, 9(4), 201–210. https://doi.org/10.1016/j.jps.2020.09.004
Rahmadian, A., & Setiawan, I. (2023). Optimasi biaya pemeliharaan mesin produksi menggunakan metode age replacement. Jurnal Optimasi Sistem Industri, 22(1), 67–78. https://doi.org/10.25077/josi.v22.n1.p67-78.2023
Rahman, S., & Hossain, M. (2021). Performance improvement of grinding machines through systematic maintenance planning. Production Engineering Research and Development, 15(2), 178–189. https://doi.org/10.1007/s11740-021-01023-4
Suhendar, R., & Lestari, D. (2021). Reliability analysis of food grinder machine components using Weibull distribution. Jurnal Teknologi Proses, 15(1), 50–58. https://doi.org/10.33021/jtp.v15i1.1234
Zhang, H., & Wang, L. (2021). Wear mechanism analysis of mechanical components in food processing machinery. Tribology International, 156, 106845. https://doi.org/10.1016/j.triboint.2020.106845
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



