Analisa Proses Wiring Pada Produksi Panel Hubung Bagi Tegangan Rendah (PHBTR) Pasang Luar 400 Ampere – 4 Jurusan

Authors

  • Naufal Taufiqul Hakim Universitas Sultan Ageng Tirtayasa
  • Mohammad Fatkhurrohman Universitas Sultan Ageng Tirtayasa

DOI:

https://doi.org/10.61132/jupiter.v2i2.200

Keywords:

Research, Low voltage connection panel (PHBTR), PHBTR wiring

Abstract

In this modern era, of course, technology is developing rapidly and increasingly sophisticated which produces various innovations in various aspects of life, including the industrial sector, it is possible in the electrical and electrical fields. The main form of the application of technology is as a driving force for the progress of science and technology and the development of the times, in making work easier and more efficient. The research was conducted to analyze the wiring process on the low-voltage connection panel (PHB-TR) at PT. Powerindo Prima Perkasa using PLN standards. The standard used in the production of low-voltage circuit boards is the PLN standard number D3.016-2 in 2010. The research was conducted to analyze the wiring process for the low-voltage connection panels (PHB- TR) at PT. Powerindo Prima Perkasa using PLN standards. The standard used in the production of low-voltage connection panels is the PLN standard number D3.016-2 in 2010. The data collection methods in this study were conducting interviews, observations, wiring on the panels and literature studies. Based on the results of the discussion in this study, the following conclusions can be drawn: [1] Knowing what components are contained in the Low Voltage Connection Panel (PHBTR). [2] Knowing the wiring process on the Low Voltage Connection Panel (PHBTR). [3] Knowing how the Low Voltage Split Connector Panel (PHBTR).

References

Ariawan, P.R. 2010. Spesifikasi Perangkat Hubung bagi Tegangan Rendah Gardu Induk Ditinjau dari Aspel Keamanan dan Kesehatan Manusia Sekitar. Jurnal Pengetahuan Lingkungan hidup. 5 – 6.

Ardian, A. 2009. Analisis Sistem Suplai Daya Instalasi Listrik Tenaga Pada Gedung PT.Smart Telecom [Skripsi]. Depok : Fakultas Teknik, Universitas Indonesia.

Buku SPLN D3.016-1: 2010. Bagian Pasang luar.

Buku SPLN D3.016-1: 2010. Bagian Pasang Dalam.

Buku SPLN D3.014-1: 2009. Transformator Arus 1.

Chandra, M. D. (2021). Perangkat Hubung Bagi Tegangan Rendah (Phb-Tr) Pada Pt. Adra Gemilang. Jurnal Teknik Elektro. Hal-26.

Djufri, Idham.2022. Transformator. Yogyakarta. CV Budi Utama.

Fahrezi, Irgi.A. 2022. Pengaruh Pertambahan Beban Jangka Panjang Terhadap Penyettingan Fuse Cut Out Dan Nieder Spannung Hoch Leistung Fuse (Studi Kasus GD-200 Kota Payakumbuh). Jurnal Institutional Reporsitory.II-14.

Fajri, Arif.A, Nurwujatanti, K.N. 2022. Pengaruh Penerapan Pemeliharaan Gardu Distribusi 20kv Menggunakan Metode Minim Padam Pada Nilai Saidi Dan Ens Di Pt. Pln (Persero) Area Bulungan (Kb 11b).Jurnal Teknologi Industri. Vol.11. No.1. Hal 3.

Fauziah, D. Waluyo, Khaidir, M.I.2019. Studi Pola Arus Bocor Isolator Keramik Selama Waktu Pemakaian 24 Jam. Jurnal Rekayasa Hijau. Vol (3).No3. 1-2.

Hasanuddin dan Nur Padli. 2019. Analisis Penentuan Faktor Dominan Penyebab Gangguan SUTM Di PT. PLN (Persero) Unit Layanan Pelanggan Malino. Makasar. Universitan Muhammadiyah Makassar.

Hartanti, Lestari Nurreta. (2018). Analisis Kondisi Perangkat Hubung Bagi Tegangan Rendah (PHB-TR) Gardu Distribusi Wilayah Ciledug. Jakarta: Universitas Negeri Jakarta.

Juhana, Dkk.2022. Experimental Study Of Sea Wave Power Plant With Mechanical Buoying System (Studi Eksperimental Pembangkit Listrik Tenaga Gelombang Laut Dengan Sistem Mekanis Pelampung). Journal Renewable Energy & Mechanics (REM). Vol. 05 No.02. 100-101.

Kawihing, A.P. & Teugeh, M & Patras, L.S. & Pakiding, M. 2013. Pemerataan Beban Transformator pada Saluran Distribuusi Sekunder. e-journal Teknik Elektro dan Komputer. 3.

Marsudi,Djiteng. 2005. Pembangkit energi Listrik. Jakarta: Erlangga Nurfadillah, R.R, Dkk.2022. Analisis Kondisi Panel Hubung Bagi Tegangan Rendah Utama pada Jaringan Distribusi Saluran Kabel Tegangan Rendah Cluster Nashville, Kota Wisata, Cibubur. Jurnal Prosiding Seminar Teknik Elektro. Vol (7). 1-2.

Nurfadillah, R.R, Dkk.2022. Analisis Kondisi Panel Hubung Bagi Tegangan Rendah Utama pada Jaringan Distribusi Saluran Kabel Tegangan Rendah Cluster Nashville, Kota Wisata, Cibubur. Jurnal Prosiding Seminar Teknik Elektro. Vol (7). 1-2.

Pabla, A.S. 1994. Sistem Distribusi Daya Listrik. Jakarta. Erlangga.

PLN Buku 3 : Standar Kontruksi Jaringan Tegangan Rendah Tenaga Listrik

PLN Buku 1: Kriteria Desain Enginering Konstruksi Jaringan Distribusi Tenaga Listrik Suartika, M. & Wijaya, I. W. A. 2010. Rekonfigurasi Jaringan TEgangan Rendah (JTR) untuk Memperbaiki Drop Tegangan di Daerah Banjar Tulangnyuh Klungkung. Jurnal Rekonfigurasi Jaringan Tegangan Rendah. 9:176.

Suhadi, TW. 2008. TEKNIK DISTRIBUSI TENAGA LISTRIK JILID 1.Jakarta :Direktorat Pembinaan Sekolah Menengah Kejuruan

Samudra, H.K, Arjana, D.G, Wijaya. Artha Wayan. 2016. Studi Peningkatan Kualitas Pelayanan Penyulang Menggunakan Load Break Switch(LBS) Three Way. Jurnal EECCIS. Vol (15). 1-2.

Downloads

Published

2024-02-05

How to Cite

Naufal Taufiqul Hakim, & Mohammad Fatkhurrohman. (2024). Analisa Proses Wiring Pada Produksi Panel Hubung Bagi Tegangan Rendah (PHBTR) Pasang Luar 400 Ampere – 4 Jurusan. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro Dan Informatika, 2(2), 274–288. https://doi.org/10.61132/jupiter.v2i2.200