Analisis Kinerja Produksi dan Faktor-Faktor yang Mempengaruhi Produktivitas Tambang Batubara di PT. XYZ

Authors

  • Andrawina Andrawina Universitas Sriwijaya

DOI:

https://doi.org/10.61132/konstruksi.v3i4.1183

Keywords:

Fleet Management, Loading Equipment, Loss Time, Physical Availability, Productivity

Abstract

This study aims to analyze production performance and the factors influencing the productivity of mining operations at PT. XYZ during August 2025. The evaluation covers production achievement against the corporate work plan (RKAP) and the owner’s operational plan, equipment availability (Physical Availability), the productivity of loading and hauling units, and various types of loss time that reduce effective working hours. The results indicate that production realization reached only 65% of the RKAP target, while achieving 102% of the owner’s plan for total material. Low equipment availability, high loss time such as no hauler, wait operator, and front preparation, as well as the underperformance of 80-ton and 100-ton units, were identified as the main contributors to production deviation. Additional influencing factors include unit reassignment, suboptimal haul road conditions, and insufficient operational fleet numbers. The study recommends optimizing fleet management, enhancing preventive and predictive maintenance programs, reorganizing hauling workflows, and controlling dominant loss time sources to improve operational efficiency and production target achievement in future periods.

References

Bascetin, A., & Nieto, A. (2007). Probabilistic analysis of truck-shovel systems in open-pit mining. International Journal of Surface Mining, Reclamation and Environment, 21(1), 18–23. https://doi.org/10.1080/13895260600963756

Bell, F. G., & Donnelly, L. J. (2006). Mining and its impact on the environment. Taylor & Francis. https://doi.org/10.1201/9781482288230

Caterpillar. (2013). Caterpillar performance handbook (43rd ed.). Caterpillar Inc.

Darling, P. (Ed.). (2011). SME mining engineering handbook (3rd ed.). Society for Mining, Metallurgy, and Exploration.

Hartman, H. L., & Mutmansky, J. M. (2002). Introductory mining engineering (2nd ed.). John Wiley & Sons.

International Energy Agency. (2020). Coal 2020: Analysis and forecasts to 2025. IEA Publications.

Kecojevic, V., & Komljenovic, D. (2011). Availability and utilization analysis of mobile fleet equipment in surface mining. Mining Engineering, 63(12), 37–42.

Miwa, S., & Takahashi, K. (2014). Improving haul road design for better truck performance. International Journal of Mining and Mineral Engineering, 5(2), 103–110. https://doi.org/10.1504/IJMME.2014.064757

Mohammadi, S., & Ataee-Pour, M. (2016). Study of reliability and availability of mining equipment using failure rate analysis. International Journal of Mining Science and Technology, 26(5), 747–753. https://doi.org/10.1016/j.ijmst.2016.07.019

Peng, S. S. (2015). Surface mining principles and practices. CRC Press.

Prasetyo, A. M. (2020). Analisis produktivitas alat gali-muat dan angkut pada tambang terbuka. Jurnal Teknologi Mineral, 11(2), 89–98. https://jurnal.teknologimineral.id

Rahman, T., & Widodo, B. (2019). Pengaruh physical availability terhadap pencapaian target produksi tambang. Jurnal Teknik Pertambangan Indonesia, 5(1), 55–62. https://journal.teknikpertambangan.id

Runge, I. (1998). Mining economics and strategy. Society for Mining, Metallurgy, and Exploration.

Sasmito, A. P. (2017). Evaluasi sistem pengelolaan jalan angkut terhadap cycle time alat angkut. Jurnal Rekayasa Pertambangan, 14(3), 244–250. https://journal.universitypertambangan.ac.id/jrp

Suwandhi, E. (2018). Perencanaan tambang terbuka. ITB Press.

Temeng, V. A., Ziggah, K., & Agyeman, P. (1997). Truck-shovel allocation for production optimization in open-pit mines. Journal of Mining Science, 33(5), 493–501. https://doi.org/10.1007/BF02562385

Downloads

Published

2025-10-30

How to Cite

Andrawina, A. (2025). Analisis Kinerja Produksi dan Faktor-Faktor yang Mempengaruhi Produktivitas Tambang Batubara di PT. XYZ. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 3(4), 265–272. https://doi.org/10.61132/konstruksi.v3i4.1183

Similar Articles