Evaluasi Invisible Lost Time dan Non-Productive Time Pada Sumur X Menggunakan Data End Of Well
DOI:
https://doi.org/10.61132/manufaktur.v2i2.332Keywords:
ILT (Invisible Lost Time), NPT (Non-Productive Time), DrillingAbstract
One of the characteristics of the oil and gas sector, especially drilling activities, is High Cost, namely high operational costs. Therefore, efficient and effective use of time is necessary to reduce operational costs. Evaluation of the influence of ILT and NPT on drilling activities was carried out to find the factors that made drilling time so long. Identifying KPIs for each activity is necessary to find out what activities can be optimized. From the analysis results it was found that the Invisible Lost Time value was 33.12% (198.75 hours) and Non-Productive Time was 18.37% (110.25 hours) caused by less than optimal performance and equipment failure. The author believes that the factors causing the relatively high ILT and NPT can still be optimized so that the costs required during drilling activities are in accordance with the desired planning.
References
Al Shamsi, J., Al Nauimi, M., Al Hosani, F., & Al Sairi, A. (2019). Invisible lost time initiative ILT in drilling-toward more efficiency, high performance and high profitability-do more with less. Society of Petroleum Engineers - Abu Dhabi International Petroleum Exhibition and Conference 2018, ADIPEC 2018. https://doi.org/10.2118/192969-ms
Maidla, E., & Maidla, W. (2011). Rigorous drilling-nonproductive-time determination and eliminating invisible lost time. JPT, Journal of Petroleum Technology, 63(9), 83–84. https://doi.org/10.2118/0911-0083-jpt
Raza, S. A., Al-Braik, H., Attalah, M., Corona, M., & Kojadinovic, N. (2017). Performance enhancement of drilling and completions operations in giant offshore field Abu Dhabi by tracking and monitoring invisible lost time and defined KPIs. Society of Petroleum Engineers - SPE Abu Dhabi International Petroleum Exhibition and Conference 2017, 2017-January(January 2016). https://doi.org/10.2118/188238-ms
Sabar, F., & Kasmungin, S. (2020). EVALUASI PERFORMA PEMBORAN TERHADAP INVISIBLE LOST TIME UNTUK MENINGKATKAN KINERJA DAN EFISIENSI PADA SUMUR B DAN D PADA PEMBORAN SUMUR PANAS BUMI. 5(1), 31–38. https://doi.org/https://doi.org/10.25105/pdk.v5i2.7353
Spoerker, H., Thonhauser, G., & Maidla, E. (2011). Rigorous identification of unplanned and invisible lost time for value added propositions aimed at performance enhancement. SPE/IADC Drilling Conference, Proceedings, 1, 17–25. https://doi.org/10.2118/138922-ms
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.